Item Code | Description of Items of Works | Unit | Quantity | Unit rates or prices | |
---|---|---|---|---|---|
6.08.05.05 | Labour charge for fitting and fixing of M.S vertical lift gate/flap gate shutters of different size including making holes in concrete for hooking arrangements with supply of necessary materials, tools and other accessories required for fitting the same to regulator/sluice and mending the damages with C.C (1:2:4), removing the spoils etc. all complete as per direction of the Engineer in charge. Size: 1.65m x 1.875m | each | 4.000 | 14326.770 | |
6.03.07 | Painting of steel sheet piles, 2 coats of bitumen paint, including preparation of surface with sand paper, brush etc. including the cost of all materials and labour etc. complete as per direction of the E-I-C | sqm | 27.000 | 392.930 | |
4.06.06.01 | Minimum 6mm thick cement plaster including neat cement finishing over concrete faces with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N including washing of sand, cleaning junctiongs of concrete, grouting, dabbing, doing independent double-legged scaffolding, finishing the edges and corners, cleaning of surfaces and curing for requisite period etc. all complete at all leads & lifts as per drawings, specification & direction of the E-I-C. Cement mortar (1:3) | sqm | 16.200 | 276.590 | |
6.03.08 | Painting of gauge on the body of structure with synthetic enamel paint etc. all complete as per specification & direction of E-I-C. | sqm | 18.000 | 111.970 | |
6.08.09 | Supplying fitting fixing of best quality P-type Rubber seal (W=75mm,T=12mm, B=25mm) for M.S Vertical Lift gate/ M.S Flap gate with nut bolt including the cost of all materials where necessary as per specification etc, all complete and direction of E-I-C. | m | 10.200 | 1398.620 | |
6.08.10 | Supplying fitting fixing of best quality U-type Rubber seal to provide bottom seal of M.S Vertical Lift gate with nut bolt including the cost of all materials where necessary as per specification etc, all complete and direction of E-I-C. | m | 16.200 | 1435.400 | |
6.05.03 | Manufacturing supplying and installation of M.S embedded parts (minimum yield strength, fy (ReH) = 300 MPa) for flap/vertical lift gate including fabricating, bending, welding, forging, drilling holes, welding anchor bars, fitting, fixing etc. all complete with a prime coat of red oxide where necessary as per design, specification and direction of the Engineer in charge. | kg | 202.912 | 176.330 | |
6.08.02 | Manufacturing, supplying and installation of hand-wheel type lifting device for slide gate with 63mm dia steel shaft, 108mm outer dia bronze nut taper roller bearing SKF-50216 etc. as per approved design including supply of all components, labours with a prime coat of red oxide etc. all complete as per specification and direction of the Engineer in charge. | each | 2.000 | 76152.650 | |
4.16.19 | SC: Providing and Appying average 1mm thick pre-packed Polymer modified cement based skim-coat for filling blowholes, non-structural honeycomb and rectifying other surface imperfections in newly placed concrete surfaces and achieving a smooth finish on precast, cast in place, tilt up or other unfinished concrete sufaces; including cleaning the surface thoroughly using stiff brush to remove dust, loose particles, oil etc., neutralizing the surface by applying potable water, ensuring saturated surface dry (SSD) condition of the concrete surface, mixing powder with potable water in a drum by blending machine, spreading the mixture to any concrete surface using trowel to get smooth suface etc. all complete as per specification and direction of E-I-C. This is avilable in market as pre-packed and is required to be applied as per instruction of the manufacturer. Proper curing method should be applied for at least 3 days, all complete as per specification and direction of E-I-C. | sqm | 33.800 | 1377.280 | |
6.01.25.01 | Removal and Disposal of surplus excavated soils from the canal/khal/pond's site/premises up to a lead of specified distance including cost of labour, equipment and machineries, including loading & unloading at both ends, transportation, all other incidental charges, leads, lifts etc. all complete as per instuction and approval of the E-I-C. The surplus excavated material must be dumped at suitable place outside of the site/premises with minimum traffic disruption approved by E-I-C Distance 21m to 100m | cum | 18.225 | 239.150 | |
6.01.21 | Earth filling work in any type of embankment/pond/low lands with specified soil by Mechanical Hydraulic Excavator, including carrying, loading, unloading and filling in layers, proper alignment, grade, camber, cross-sections and side slopes etc. all complete for all lift and lead including cost of hire charges of Excavator and all other Machines, equipment, fuels , lubricants and wages of operational staff etc. all complete including cost of all materials, equipments and labours as per direction of the Engineer-in-Charge. | cum | 33.752 | 165.870 | |
6.13.04. | Bailing out water by 1 cusec diesel operated pump including hire charge of pump, fuel, operator, spares and maintenance etc all complete and accepted by the E-I-C, [PWD 02.19.1] | LS | 1.000 | 10000.000 | |
6.08.04.05.1 | Repair & Manufacturing and supplying of M.S Flap gate shutter of 8mm thick M.S skin plate and stiffener with minimum 75mmx75mmx10mm M.S angle as frame, horizontal & vertical beams,100mmx45mmx16mm p-type rubber seal, fixed with 10mm dia x63.5mm M.S counter sink and hex nuts & bolts and 40mmx10mm M.S strip as clamp drilled spaces @150mm c/c hinge assembled with gate and wall bracket, link arm of 19mm thick M.S plate, 4 nos. 25mm diax150mm stainless steel hinge pin with proper thread, and nut, cotter pin and washer as per approved design with a prime coat of red oxide where necessary etc. all complete as per drawing specification and direction of the Engineer in charge. Size: 1.65m x 1.875m | each | 2.000 | 35000.000 | |
3.09.04 | ReCCB(cum): Labour charge for Setting/Resetting of single layer CC Block of different sizes on road top, including preparation base, true to level, maintaining camber, super elevation, grade, watering and ramming the base, including carrying CC blocks, supplying and filling the interstices tightly with sand (FM - 0.5), etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. | cum | 29.160 | 1044.270 | |
1.10.01 | Videography: Providing and carrying out video shoting of roads, bridges, buildings, other programmes by professional videographer including hiring of vehicle, equipment for video shooting, titling, lightening, mixing, lettering, editing including cost of two DVDs of approved makes and quality etc. all complete as per direction of E-I-C. The edition of the video film and the script for narration shall be as approved by the engineer. Within 50 kilometer from district head quarter for full day | day | 1.000 | 1693.300 | |
3.01.4.2.02 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at specified degree of compaction etc. all complete as per direction of the E-I-C. Degree of Compaction: Minimum 95% of MDD (Modified Proctor) | sqm | 3124.375 | 109.810 | |
3.02.1.2 | Sand (FM 0.80) filling on the road bed in the improved sub-grade with sand (minimum FM 0.8) free from dust, earth, other vegetable growth, foreign materials etc. including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum Design Soaked CBR but not less than 8% at minimum compaction 98% of Maximum Dry Density (MDD) (Modified Proctor), etc. all complete as per direction of the E-I-C. | cum | 815.594 | 979.730 | |
3.03.3.4 | SBBC(FM-0.8): Providing compacted aggregate sand sub-base course with 38mm down Crusher run 1st class bricks/picked chips of LAA value not exceeding 40 & sand of minimum FM 0.80 mixed in proportion 1:1 by volume placed in layer(s), mixing properly, watering, compacting with 8~10 tonne road roller to attain each layer's minimum soaked CBR 35% or Design CBR at minimum compaction 98% of MDD (Modified Proctor) including supplying of all materials, labourers, tools and equipment etc. all complete as per direction of the E-I-C. | cum | 464.319 | 4209.300 | |
3.04.3.2 | EE(125mm): Brick on end edging (125mm across) with 1st class/picked bricks including cutting trenches true to level & maintaining grade, removing earth, re-filling & ramming the sides properly, including supplying and filling the gaps with local sand, etc. all complete as per direction of the E-I-C. | m | 2009.000 | 239.640 | |
5.15.14.05 | Supplying, fitting and fixing country made floor tiles complying BDS ISO 13006: 2015, water absorption = 0.5%, modulus of rupture (MOR) = 27 N/mm2, irrespective of color &/or design, with adhesives in full thickness of tiles, filler/tiles grout including cutting, shaping, placing in proper level etc. all complete and accepted by the Engineer in charge. In ground floor (PWD BW 06.14) GP Mirror Polished floor tiles (600 mm x 600 mm) | sqm | 77.186 | 2038 | |
5.15.06.1 | Supplying, fitting and fixing country made glazed wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including cost of water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor (PWD BW 06.6) Wall tiles less than, equal or equivalent to 250 mm x 330 mm in sizes | sqm | 9 | 1311 | |
5.17.06.1 | ''Supplying, fitting and fixing of best quality PVC board false ceiling (Drop/Plain) of size 600 mm x 600 mm of approved design, minimumn PVC content of 35%, framing by aluminium/ powder coated aluminium T-bar of any colour and of natural anodized finish suspended in 600 mm x 600 mm grid from ceiling by 12 SWG double ply wire, fixed to the ceiling by rowel plug, screws, hooks, nails etc., maintaining straight lines and desired finished level at bottom face including vertical wooden strut as required, making holes in slabs or beams by electric drill machine and mending good the damages, if any during execution of the work, including the provisions of lighting arrangement,also including cost of all materials, electricity, accessories, scaffoldings, labour for installation, screws, nails, etc. all complete as per drawing, design and accepted by the Engineer-in-charge. Measurement will be taken as per finished surface area. [PWD 18.1.6] 6 mm thick PVC board false ceiling [PWD 18.1.6.1]'' | sqm | 54 | 2424 | |
5.02.01.2 | ''Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer's approval shall not relieve the contractor of his responsibilities and obligations under the contract. [PWD 02.1] Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead [PWD 02.1.2] '' | cum | 13.287 | 153 | |
5.02.08.2 | Sand filling in foundation trenches and plinth with sand having minimum F.M. 0.8 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. [PWD 02.10.2] | cum | 8.121 | 1114 | |
5.03.01 | One layer brick flat soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge [PWD 03.1.1] | sqm | 22.5 | 607 | |
5.04.25 | 75 mm thick cement concrete (1:3:6) flooring with cement, best quality coarse sand and 19 mm down graded picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting, washing and screening of sand (F.M 1.2) and curing at least for 7 days etc. including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) (PWD 04.25) | sqm | 33.14 | 680 | |
5.04.01 | Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) (PWD 04.1) | cum | 5.048 | 8744 | |
5.04.16 | 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD 04.16) | sqm | 11.6 | 1346 | |
5.12.04 | Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to dado with cement (1:4) up to 150 mm including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.3] | sqm | 3.75 | 373 | |
5.05.01.01 | ''RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level (PWD 07.1.1)'' | cum | 3.78 | 10035 | |
5.05.01.02 | ''RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Pedestal, column, column capital, lift wall and wall up to ground floor (PWD 07.1.2)'' | cum | 1.422 | 10367 | |
5.05.01.03 | ''RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and step etc. up to ground floor (PWD 07.1.3)'' | cum | 4.492 | 10167 | |
5.12.07 | Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:3) with fresh cement to ceiling, R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.6] | sqm | 48.16 | 278 | |
5.06.01.02 | Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement (excluding laboratory test fees) for Reinforced concrete, produced and marked in accordance with BDS ISO 6935-2:2016 (or standard subsequently released from BSTI) including straightening and cleaning rust, if any, bending and binding in position with supply of G.I. wires,conducting necessary laboratory tests etc. (excluding splices or laps) complete in all respect and accepted by the Engineer-in-charge (Measurement shall be recorded only on standard mass per unit length of bars, while dia of bars exceeds its standard) . (PWD 08.1) Grade 400 (B400DWR / B420DWR: complying BDS ISO 6935-2:2016 / ASTM A615) ribbed or deformed bar produced and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding 480 MPa and whatever is the actual yield strength within allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and minimum total elongation at maximum force is 17% and 8% respectively : up to ground floor. . (PWD 08.1.2) | kg | 1500.391 | 120 | |
7.29.4 | ''Supplying, fitting and fixing of best quality country made 12 mm bib cock made from copper or copper alloy, chromium plated. The faucet conforms BDS EN 200:2009. The faucet tap shall be free from any leakage, permeation and other abnormalities. The water hammer value shall be 1.47 Mpa or under. The faucet after it has been operated 100000 times it shall be free from a seat- leakage and shall satisfy the reverse flow preventing performance. The inside and outside surfaces of the faucet shall be smooth and be free from blowholes, fissures, remarkable flows or injurious defects. The chromium plating on the faucet shall be of class 2 grade 1. The final coating should be done with chromium of minimum 0.1 micron. The faucet shall be made leak proof and fixing in position with selected tape etc. , all complete approved and accepted by the Engineer- in- charge. 12 mm CP Two in One Bib Cock (PWD BW 26.29.4)'' | each | 16 | 1836 | |
7.42.6 | Supplying, fitting and fixing of G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good the damages etc. all complete in all respects approved and accepted by the Engineer- in- charge. 50 mm dia G.I. pipe with wall thickness 3.65 mm, outside diameter min 57.3 mm, weight 5.38 kg/m, can withstand min 50 kg/cm2 hydraulic pressure. (PWD BW 26.42.6) | m | 5 | 1479 | |
3.07.3.10.5 | Supplying different inside dia best quality uPVC pressure pipe having specific gravity 1.35 - 1.45, and other physical, chemical, themal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer-in-charge. 37 mm dia wall thickness 2.5 mm - 3.1 mm | m | 12 | 233.47 | |
5.05.13.01 | FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: (PWD 07.18) Individual and combined footings (PWD 07.18.1) | sqm | 8.784 | 502 | |
5.05.13.02 | FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: (PWD 07.18) Foundation beam (PWD 07.18.2) | sqm | 14.25 | 458 | |
5.05.13.03 | FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: (PWD 07.18) Padestals, column, wall (PWD 07.18.3) | sqm | 1.464 | 508 | |
5.05.13.05 | FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: (PWD 07.18) T-beam, L-beam and rectangular beam (PWD 07.18.5) | sqm | 0.87 | 490 | |
5.05.13.06 | FORMWORK (Wooden) for boundary wall, gate, centry post etc. Centering and shuttering, including strutting, propping etc. and removal of form for: (PWD 07.18) Floor & roof slab (PWD 07.18.6) | sqm | 28.44 | 552 | |
N.P.01 | Supplying Fitting & Fixing marble Stone Name Plate etc. all Complete as par direction of the EIC. | LS | 1 | 2000 | |
7.56.1 | Supplying different inside dia best quality uPVC clean out / trap having specific gravity 1.35 -1.45 and other physical, chemical, themal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards, fitting and fixing in position etc. complete approved and accepted by the Engineer- in- charge. 50 mm dia uPVC Y or T - Y Cleanout (PWD BW 26.56.1) | each | 16 | 343 | |
7.80.10 | Supplying, fitting and fixing the following materials including carriage to the work site from Titas Gas Store as per specification of Titas Gas (T and D) Co. Ltd. and accepted by the Engineer-in-charge. (Rate is excluding the cost of welding) 50 mm dia end cap (PWD BW 28.3.10) | each | 1 | 103 | |
5.16.01 | Exterior standard acrylic emulsion paint of approved best quality and color having water resisting properties and resistance properties against fungi, fading & flaking delivered from authorized local agent of the manufacturer in a sealed container; applying to exterior surface with surface preparation including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary exterior sealer of specified brand on prepared surface; then applying necessary exterior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of exterior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-incharge. [PWD 16.1.1] | sqm | 437.484 | 261.000 | |
5.16.03.1 | Interior standard acrylic emulsion paint (plastic or matt finish) of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container; applying to interior wall and ceiling with surface preparation including cleaning drying, making free from dirt, grease, wax, removing all chalked and scaled materials, fungus, mending good the surface defects using sand paper and necessary scaffolding; applying necessary interior sealer of specified brand on prepared surface; then applying necessary interior putty of specified brand for levelling, spot filling, crack filling and cutting by sand paper/zero water paper; finally applying 2 coats of interior emulsion paint spreading by brush/roller/spray & necessary scaffolding etc. upto desired finishing, elapsing specified time for drying or recoating; all complete in all floors and accepted by the Engineer-incharge. [PWD 16.2.1] | sqm | 1545.238 | 245.000 | |
5.16.04.1 | Standard synthetic enamel paint of approved best quality and colour delivered from authorized local agent of the manufacturer in a sealed container, having high water resistance, high bondibility, flexibility property; using specified brand thinner applying to metallic or wooden surface by brass/roller/spray in 2 coats over single coat anti-corrosive coating including cleaning, drying, making free from dirt, grease, wax, removing all chalked and scaled materials, all complete in all floors and accepted by the Engineer-in-charge. [PWD 16.3.1] | sqm | 148.660 | 216.000 | |
5.16.11.1 | Wood varnishing of approved quality and colour delivered from authorized local agent of the manufacturer in a sealed container using brand specified thinner to door and window frame and shutter in three coats, applied with brush including cleaning oil, grease, dirt, making dry, sand papering, if required washing with weak detergent solution, stripping out the colour straps, finishing the surface, etc. all complete in all floors and accepted by the Engineer-in-charge. [PWD 16.10.0] Yacht[PWD 16.10.1] | sqm | 26.250 | 196.000 | |
3.01.4.2.01 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at specified degree of compaction etc. all complete as per direction of the E-I-C. Degree of Compaction: Minimum 98% of MDD (Standard Proctor) | sqm | 1555.000 | 98.030 | |
3.05.7.1.02 | WBMBC: Providing compacted brick aggregate base course, including supplying, spreading and compacting 50mm downgraded crusher run 1st class and Picked brick chips (LAA value not exceeding 40%) including supplying of required amount of 12mm downgraded chips made of same quality bricks, including spreading uniformly in layers of specified loose thickness on road surface maintaining grade, camber and super elevation including local handling, hand packing, booming, watering, dry rolling followed by wet rolling in layers with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction, including supplying choking/screening material as filler material @0.018cum/sqm or as required including cost of materials, labours etc. all complete as per direction of the E-I-C. After adequate dry rolling spreading of choking/screening material on the surface, sprinkling water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and measurement for Payment will be made on compacted thickness. Degree of Compaction: 100% of MDD (Modified Proctor) | cum | 225.000 | 7069.630 | |
3.05.7.1.02 | WBMBC: Providing compacted brick aggregate base course, including supplying, spreading and compacting 50mm downgraded crusher run 1st class and Picked brick chips (LAA value not exceeding 40%) including supplying of required amount of 12mm downgraded chips made of same quality bricks, including spreading uniformly in layers of specified loose thickness on road surface maintaining grade, camber and super elevation including local handling, hand packing, booming, watering, dry rolling followed by wet rolling in layers with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction, including supplying choking/screening material as filler material @0.018cum/sqm or as required including cost of materials, labours etc. all complete as per direction of the E-I-C. After adequate dry rolling spreading of choking/screening material on the surface, sprinkling water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and measurement for Payment will be made on compacted thickness. Degree of Compaction: 100% of MDD (Modified Proctor) | cum | 225.000 | 7069.630 | |
3.06.1.2 | PCMD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen to be prepared by cutting back 60/70 penetration grade straight run bitumen (conforming to the requirements of ASTM/ AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of the surface and will be decided by field trials, the correct quantity that is completely absorbed within 24 hours including carefully cleaning of the surface of the granular base material to be primed and spraying cut back bitumen at a temperature from 100°C to 120°C by mechanical distributor, etc. complete as per direction of the E-I-C.[Retail] | sqm | 1500.000 | 157.150 | |
3.06.4.2.01 | 25mmDC: Providing 25mm thick (minimum) compacted pre-mixed bituminous surfacing - wearing course with 16mm downgraded crushed stone chips complying with the specified grading requirement of the relevant item of Road Design standards, of LAA value < =30%, water absorption not >2%, flakiness index not >35% mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen and stone-chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively before mixing. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The bitumen and stone-chips mixture shall be laid uniformly on the road surface in single appropriate layer to give specified compacted thickness maintaining specified camber, grade and super-elevation. The mixture should be rolled at a temperature not below 90°C with Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to full compaction, including supplying of all materials, their carriage, labourers tools and equipment etc. all complete as per the direction of the E-I-C. The bitumen in the mix shall be between 5.0% to 5.5% by weight of total mix or as determined by job mix design. (In order to achieve the specified grading a blending of nominal maximum size of 16mm, 12mm, 6mm crushed stone chips and stone dust is suggested and proportion will have to determine by the laboratory analysis). Bitumen Grade 60/70 [Retail] | sqm | 1500.000 | 629.410 | |
3.05.7.1.01 | WBMBC: Providing compacted brick aggregate base course, including supplying, spreading and compacting 50mm downgraded crusher run 1st class and Picked brick chips (LAA value not exceeding 40%) including supplying of required amount of 12mm downgraded chips made of same quality bricks, including spreading uniformly in layers of specified loose thickness on road surface maintaining grade, camber and super elevation including local handling, hand packing, booming, watering, dry rolling followed by wet rolling in layers with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction, including supplying choking/screening material as filler material @0.018cum/sqm or as required including cost of materials, labours etc. all complete as per direction of the E-I-C. After adequate dry rolling spreading of choking/screening material on the surface, sprinkling water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and measurement for Payment will be made on compacted thickness. Degree of Compaction: Minimum 98% of MDD (Modified Proctor) | cum | 453.225 | 6677.630 | |
3.06.1.1 | PCHD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen to be prepared by cutting back 60/70 penetration grade straight run bitumen (conforming to the requirements of ASTM/ AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of the surface and will be decided by field trials, the correct quantity that is completely absorbed within 24 hours including carefully cleaning of the surface of the granular base material to be primed and spraying cut back bitumen at a temperature from 100°C to 120°C by appropriate hand device, etc. complete as per direction of the E-I-C. [Retail] | sqm | 3021.500 | 155.450 | |
3.06.4.2.02 | 25mmDC: Providing 25mm thick (minimum) compacted pre-mixed bituminous surfacing - wearing course with 16mm downgraded crushed stone chips complying with the specified grading requirement of the relevant item of Road Design standards, of LAA value < =30%, water absorption not >2%, flakiness index not >35% mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen and stone-chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively before mixing. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The bitumen and stone-chips mixture shall be laid uniformly on the road surface in single appropriate layer to give specified compacted thickness maintaining specified camber, grade and super-elevation. The mixture should be rolled at a temperature not below 90°C with Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to full compaction, including supplying of all materials, their carriage, labourers tools and equipment etc. all complete as per the direction of the E-I-C. The bitumen in the mix shall be between 5.0% to 5.5% by weight of total mix or as determined by job mix design. (In order to achieve the specified grading a blending of nominal maximum size of 16mm, 12mm, 6mm crushed stone chips and stone dust is suggested and proportion will have to determine by the laboratory analysis). Bitumen Grade 60/70 [Bulk] | sqm | 3021.500 | 618.560 | |
3.12.01.1 | kmPost: Providing, fitting and fixing rectangular Kilometer Post as per standard drawing enumerated in Appendix-6 (type design for Kilometer post) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 4 nos. of 12mm dia M.S. rods in vertical direction of length 1085mm and 7nos. Of 10mm dia M.S. rods in horizontal direction of length 520mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 2.000 | 3844.660 | |
3.12.01.2 | RNPlate: Providing, fitting and fixing rectangular Road Name Plate as per standard drawing enumerated in Appendix-6 (type design for Road Name Plate) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 7 nos. of 12mm dia M.S. rods in vertical direction of length 1125mm and 8nos. Of 10mm dia M.S. rods in horizontal direction of length 970mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 1.000 | 7274.690 | |
3.12.02 | RCC-Gpost: Prroviding, fitting and fixing 200mm dia round RCC Guide Post 1.70m long as per standard drawing enumerated in Appendix-6 (type design for Guide Post) with Reinforced Cement Concrete (1:2:4) with 20mm down well graded brick chips casting, curing for requisite period, including cost of providing 4nos.of 12mm dia. Rod of length 1.65m as main reinforcement and 12 nos. of round shaped 8mm dia rods used as binders; including two coats of painting with best quality synthetic enamel paint over a prime coat of approved brand of different colour and grade to form 6 nos. horizontal alternate bands in white/yellow and red to 90 cm length standing up above ground, making hole in ground of 800mm depth and 300m minimum dia, fixing the guard posts in the same holes and repacking the earth properly so as to keep the guard posts standing properly erect in correct position true to line and length including carriage of RCC Guide Post with due care to the site including loading into the truck and unloading at site complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 28.000 | 1820.010 | |
3.12.04.1 | CRS-Plate: Providing and fixing of retro-reflectorized cautionary, mandatory and informatory sign as per standard drawing enumerated in Appendix-6 (type design for Traffic Signs) made of 18 BWG M.S. sheet of equilateral triangle/Circular/Rectangular plates of different sizes as mentioned in the drawing fitted with MS triangular/Rectangular frame of same size as plates by point welding (frames made by thorough welding of 25mmX25mmX3mm MS angle covering all sides of the plates and maximum 150mm center to center in the middle of frames in each vertical & horizontal directions), Plates are fitted with 50mm dia & 2.90mm thick MS pipes by continuous welding, including cutting of MS angle at touched point of MS pipe, including cost of providing 200mm long 4 nos. 12mm dia anchor bars be fitted at the lower part of the GI pipes by welding, making finishing, grinding and carrying to the working sites, the post firmly fixed to the ground by means of properly deigned foundation with cement concrete of minimum cylinder crushing strength of concrete 17.0Mpa at 28 days of curing (Suggested Mix Proportion 1:2:4), 60cm below the ground level, the signs properly erect in correct position, true to line and length, including two coats of painting with best quality synthetic enamel paint of approved brand & printing with retro-reflective paint of different approved colour, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. 600mm equilateral triangle with 671mm X 202mm supplementary Plate (For Precautionary Sign) | each | 4.000 | 6468.440 | |
2.02.2.01 | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 85% Compaction | cum | 55.815 | 256.890 | |
4.05.01.01.01 | Earth work in excavation of foundation of structures by mechanical (Hydraulic excavator - Long Boom)/ manual means in all sorts of soil up to specified depth in accordance with requirements of lines, grades, cross sections and elevation as shown in the drawing including setting out, removal of stumps, logs, boulders and other deleterious materials, providing necessary tools and plants, construction of shoring and bracing, cleaning the excavated materials to a safe distance out of the site premises, cut to a firm surface including pumping/ bailing out water, removal of spoils to a safe distance, dressing of sides and bottom and backfilling of trenches up to original level with approved material etc. all complete as per approval of E-I-C. Contractor shall get acquainted with site conditions, nature of soil and adopt suitable adequate dewatering system as deemed fit for the nature of soil and prevailing water table to get the surface reasonably dry for laying PCC at the time of execution so that execution will not be hampered or delayed. Back-filled materials shall be compacted to a density comparable with the adjacent undisturbed material. Earth work in Ordinary Soil by Manual Means for an initial lead up to 30m For depth up to 3m | cum | 63.617 | 203.990 | |
4.06.01.01 | Sand filling on the prepared foundation bed with sand of specified FM in layers not more than 150mm thick including necessary carriage, leveling, watering and ramming to achieve minimum dry density (MDD) of 95% STD compaction with optimum moisture content (OMC) by ramming each layer up to finished level as per direction of E-I-C. Sand of Minimum FM 0.8 | cum | 2.869 | 1021.870 | |
4.06.02 | Single layer brick flat soling with 1st class or picked kiln burnt bricks in foundation, filling the interstices tightly with sand of minimum FM 0.50, watering, leveling, dressing, etc. all complete as per instruction of the E-I-C. | sqm | 2.080 | 564.710 | |
5.03.05 | Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in floor or any where below cement concrete complete in all respect and accepted by Engineer-in-charge. [PWD 03.7] | sqm | 21.205 | 46.000 | |
4.06.03 | PCC-10: Plain cement concrete work in foundation with minimum compressive strength of 10 MPa at 28 days (sugessted mix proportion 1:3:6) on standard cylinder as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well graded 1st class/ picked brick chips (LAA value not exceeding 40) comforming to ASTM C 33 including breaking bricks into chips, shuttering, mixing by concrete mixer machine, casting, laying compacting and curing for the requisite period etc. all complete as per direction of the E-I-C. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. | cum | 1.434 | 10163.410 | |
4.09.03.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. [Using Concrete Mixture Machine and retail rate of Cement] For pile caps, abutment base, facing elements of Reinforced/ Mechanically Stabilized Earth Structure, bottom slab of Box Culvert etc. | cum | 4.555 | 16410.540 | |
4.09.03.02.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. [Using Concrete Mixture Machine and retail rate of Cement] For diaphragm walls, wing walls, piers, columns, projected pile cap above water level, pier caps, abutments of bridges and vertical members of box culverts For height up to 5m | cum | 8.180 | 17163.320 | |
4.09.03.05.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. [Using Concrete Mixture Machine and retail rate of Cement] For top slab including curb and wheel guard of box culvert Height up to 5 m | cum | 3.313 | 19572.200 | |
4.11.01.02.01 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET/SUST. Grade B400C-R/ B400CWR/ 400DWR: Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2016 with minimum yield strength, fy (ReH) = 400 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 17% and 8% respectively. Using retail rate of reinforcing bar | kg | 2279.756 | 122.930 | |
4.13.01 | CWC: Providing and laying wearing course on deck slab of bridge with minimum cement content ralates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, Coarse sand of minimum FM 2.5 and 6mm down well graded crushed stone chips broken from boulders (preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30), including breaking stone boulders into chips, screening through proper sieves, casting, finishing complete to camber and grade, compacting, curing at least for 28 days, etc. including cost and carriage of all materials, labour, water, electricity, other incidental cost etc. all complete as per design, drawing, specification & directionn of E-I-C. | cum | 0.478 | 13396.590 | |
4.11.05 | Providing nosing with MS angles of different sizes. including cost of all materials, welding, carrying, etc. all complete as per design, drawing and direction of the E-I-C. | kg | 63.750 | 168.350 | |
4.13.04.01 | WH: Providing weep holes in Brick masonry/ Plain/ Reinforced concrete retaining wall, abutment, wing/ return wall, with 50 - 100 mm dia uPVC pipe extending through the full width of structure with slope 1V : 20H towards draining face including hand packing of 0.85 cum pervious backfill material (40mm - 63mm sized 1st class/picked brick bats) wrapped in Geo-fabric (Grade-III-DF-40-2.3mm thick) in the back of each weep hole etc. all compete as per direction of the E-I-C. [Cost of uPVC pipe, Geo-bag, brick bats, mortar etc. is included in this item and shall not be paid separately.] WH50: Using 50mm dia uPVC pipe | each | 4.000 | 530.100 | |
4.13.02.04 | Providing & fixing rainwater down pipes including cost of all materials, labours, equipment, transportation, fixtures, accessories etc. at any level as per specification, drawings and direction of the E-I-C. RWDP50PVC: 50mm uPVC Pipe of 2.5mm to 3mm wall thickness conforming to BS 3505 | m | 1.600 | 180.370 | |
4.06.05.02 | Brick work with 1st class brick in specified cement mortar in foundation with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, curing at least for 7 days etc. all complete as per design, specification & direction of the E-I-C. Cement mortar (1:4) | cum | 7.878 | 9532.280 | |
4.06.06.02 | Minimum 6mm thick cement plaster including neat cement finishing over concrete faces with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N including washing of sand, cleaning junctiongs of concrete, grouting, dabbing, doing independent double-legged scaffolding, finishing the edges and corners, cleaning of surfaces and curing for requisite period etc. all complete at all leads & lifts as per drawings, specification & direction of the E-I-C. Cement mortar (1:4) | sqm | 51.594 | 264.090 | |
3.01.4.2.01 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at specified degree of compaction etc. all complete as per direction of the E-I-C. Degree of Compaction: Minimum 98% of MDD (Standard Proctor) | sqm | 3128.482 | 98.030 | |
3.11.33.01 | Brick (BP-TW): Construction and Installation in position brick palisading work as per standard drawing enumerated in Appendix-6 (type design for protective work) with 375mm thick Brick Masonry work upto 500 mm height from bottom & rest 500 mm height 250mm thick Brick Masonry work and Pre cast RCC Post of 03 (three) meter long (150mmX150mm) and capping beam (200mmX150mm) using 20mm down graded crushed stone chips (LAA value not exceeding 30), sand (minimum FM 2.5) and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N to attain a minimum 28 days cylinder crushing compressive strength 25.00 Mpa ( mixing ratio 1:1.5:3 & maximum water cement ratio 0.4) as per standard practice of code AASHTO/ASTM including supplying, fabricating and binding of 400/420 Grade MS deformed bar of required size, length and spacing. The pre-cast post must be driven by suitable monkey/drop hammer in 5/6 th of its total length @ 1 m c/c into the ground laying on proper alignment. Brick Masonry work in cement mortar (1:3), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including flush pointing at front face of the brick wall with cement mortar (1:2), curing for requisite period, including excavating minimum 575mm depth foundation trenches for brick wall and laying one layer polythene sheet, casting 75mm thick cement concrete (1:3:6) below the 375 mm brick work by means approved designed including form work, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. (Unit cost includes Brick wall, all casting work, reinforcement, its fabrication, shuttering, curing for 28 days, driving of the post, lab testing charges as per design and all other incidental charges, etc.) with capping beam | m | 78.000 | 9013.890 | |
3.04.1.1 | PiEE(75mm): Labour charge for picking up the existing brick on end edging (75mm across) including staking the materials at a specified distance, etc. all complete as per direction of the E-I-C. | m | 458.000 | 8.590 | |
3.08.1.1 | PiBFS: Labour charge for picking up the existing brick flat (BFS) soling and staking the materials at a specified distance, etc. all complete as per direction of the E-I-C. | sqm | 359.970 | 20.250 | |
4.11.01.02.01 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET/SUST. Grade B400C-R/ B400CWR/ 400DWR: Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2016 with minimum yield strength, fy (ReH) = 400 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 17% and 8% respectively. Using retail rate of reinforcing bar | kg | 793.004 | 122.930 | |
2.02.2.01 | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 85% Compaction | cum | 55.815 | 256.890 | |
3.02.1.1 | Sand (FM 0.50) filling on the road bed in the improved sub-grade with sand (minimum FM 0.5) free from dust, earth, other vegetable growth, foreign materials etc. including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum Soaked CBR 8% or Design CBR at minimum compaction 98% of Maximum Dry Density (MDD) (Modified Proctor), etc. all complete as per direction of the E-I-C. | cum | 1621.376 | 938.810 | |
3.11.33.02 | Brick (BP-TW): Construction and Installation in position brick palisading work as per standard drawing enumerated in Appendix-6 (type design for protective work) with 375mm thick Brick Masonry work upto 500 mm height from bottom & rest 500 mm height 250mm thick Brick Masonry work and Pre cast RCC Post of 03 (three) meter long (150mmX150mm) and capping beam (200mmX150mm) using 20mm down graded crushed stone chips (LAA value not exceeding 30), sand (minimum FM 2.5) and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N to attain a minimum 28 days cylinder crushing compressive strength 25.00 Mpa ( mixing ratio 1:1.5:3 & maximum water cement ratio 0.4) as per standard practice of code AASHTO/ASTM including supplying, fabricating and binding of 400/420 Grade MS deformed bar of required size, length and spacing. The pre-cast post must be driven by suitable monkey/drop hammer in 5/6 th of its total length @ 1 m c/c into the ground laying on proper alignment. Brick Masonry work in cement mortar (1:3), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including flush pointing at front face of the brick wall with cement mortar (1:2), curing for requisite period, including excavating minimum 575mm depth foundation trenches for brick wall and laying one layer polythene sheet, casting 75mm thick cement concrete (1:3:6) below the 375 mm brick work by means approved designed including form work, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. (Unit cost includes Brick wall, all casting work, reinforcement, its fabrication, shuttering, curing for 28 days, driving of the post, lab testing charges as per design and all other incidental charges, etc.) without capping beam | m | 78.000 | 7938.860 | |
2.02.1.3 | EFW: Earth work in road embankment up to a lift of 1.5 m in all kinds of soil including cutting and throwing earth in layers not exceeding 150 mm in thickness, breaking clods up to 40 mm size in each layer, ramming, leveling and dressing as per required side slope and alignment with earth borrowed from the road side govt. acquired land for any leads and maintaining the embankment true to level and side slopes as per profiles for one year from the date of completion including making dug, bailing, profiling etc. complete and accepted by the Engineer-in-charge. [PWD 24.1] For additional lift of 1 m beyond 2.5 m up to 3.5 m | cum | 141.400 | 234.000 | |
1.02.B | Project Profile Signboard: Providing and fixing of typical project profile signboard as per direction of E-I-C, to be placed at a suitable place of the site including submission of proposals for the materials & size of the signboards (recommended size: 1800mm x 1200 mm with 2 nos. 75mm dia. MS post, outer & inner frames of board shall be 50mm x 50mm x 5mm & 25mm x 25mm x 5 mm respectively ) and text layout to the engineer for approval which will be positioned as directed by the engineer and removing the same on completeion of the works or as instructed by the E-I-C. Sheeting will be made of encapsulated lens with retro-reflective type and messages/ borders will be screen printed. The text shall mention among others the name of the project, name of the implementing agency, cost of the project, completion time, name of the contractor etc. | LS | 1.000 | 5000.000 | |
3.12.04.4 | CRS-Plate: Providing and fixing of retro-reflectorized cautionary, mandatory and informatory sign as per standard drawing enumerated in Appendix-6 (type design for Traffic Signs) made of 18 BWG M.S. sheet of equilateral triangle/Circular/Rectangular plates of different sizes as mentioned in the drawing fitted with MS triangular/Rectangular frame of same size as plates by point welding (frames made by thorough welding of 25mmX25mmX3mm MS angle covering all sides of the plates and maximum 150mm center to center in the middle of frames in each vertical & horizontal directions), Plates are fitted with 50mm dia & 2.90mm thick MS pipes by continuous welding, including cutting of MS angle at touched point of MS pipe, including cost of providing 200mm long 4 nos. 12mm dia anchor bars be fitted at the lower part of the GI pipes by welding, making finishing, grinding and carrying to the working sites, the post firmly fixed to the ground by means of properly deigned foundation with cement concrete of minimum cylinder crushing strength of concrete 17.0Mpa at 28 days of curing (Suggested Mix Proportion 1:2:4), 60cm below the ground level, the signs properly erect in correct position, true to line and length, including two coats of painting with best quality synthetic enamel paint of approved brand & printing with retro-reflective paint of different approved colour, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. 810mm X 480mm Rectangular (For Informative Sign) | each | 1.000 | 6470.730 | |
inauguration | Supplying and installation rectangular Inauguration Ensis as par direction of the EIC.to the placed at a suitable place of the starting chainage. | LS | 1.000 | 2000.000 | |
3.03.3.4 | SBBC(FM-0.8): Providing compacted aggregate sand sub-base course with 38mm down Crusher run 1st class bricks/picked chips of LAA value not exceeding 40 & sand of minimum FM 0.80 mixed in proportion 1:1 by volume placed in layer(s), mixing properly, watering, compacting with 8~10 tonne road roller to attain each layer's minimum soaked CBR 35% or Design CBR at minimum compaction 98% of MDD (Modified Proctor) including supplying of all materials, labourers, tools and equipment etc. all complete as per direction of the E-I-C. | cum | 465.670 | 4209.300 | |
3.04.3.2 | EE(125mm): Brick on end edging (125mm across) with 1st class/picked bricks including cutting trenches true to level & maintaining grade, removing earth, re-filling & ramming the sides properly, including supplying and filling the gaps with local sand, etc. all complete as per direction of the E-I-C. | m | 2014.000 | 239.640 | |
4.05.01.01.01 | Earth work in excavation of foundation of structures by mechanical (Hydraulic excavator - Long Boom)/ manual means in all sorts of soil up to specified depth in accordance with requirements of lines, grades, cross sections and elevation as shown in the drawing including setting out, removal of stumps, logs, boulders and other deleterious materials, providing necessary tools and plants, construction of shoring and bracing, cleaning the excavated materials to a safe distance out of the site premises, cut to a firm surface including pumping/ bailing out water, removal of spoils to a safe distance, dressing of sides and bottom and backfilling of trenches up to original level with approved material etc. all complete as per approval of E-I-C. Contractor shall get acquainted with site conditions, nature of soil and adopt suitable adequate dewatering system as deemed fit for the nature of soil and prevailing water table to get the surface reasonably dry for laying PCC at the time of execution so that execution will not be hampered or delayed. Back-filled materials shall be compacted to a density comparable with the adjacent undisturbed material. Earth work in Ordinary Soil by Manual Means for an initial lead up to 30m For depth up to 3m | cum | 17.841 | 203.990 | |
4.06.06.02 | Minimum 6mm thick cement plaster including neat cement finishing over concrete faces with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N including washing of sand, cleaning junctiongs of concrete, grouting, dabbing, doing independent double-legged scaffolding, finishing the edges and corners, cleaning of surfaces and curing for requisite period etc. all complete at all leads & lifts as per drawings, specification & direction of the E-I-C. Cement mortar (1:4) | sqm | 51.594 | 264.090 | |
3.02.1.2 | Sand (FM 0.80) filling on the road bed in the improved sub-grade with sand (minimum FM 0.8) free from dust, earth, other vegetable growth, foreign materials etc. including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum Design Soaked CBR but not less than 8% at minimum compaction 98% of Maximum Dry Density (MDD) (Modified Proctor), etc. all complete as per direction of the E-I-C. | cum | 816.500 | 979.730 | |
3.12.01.1 | kmPost: Providing, fitting and fixing rectangular Kilometer Post as per standard drawing enumerated in Appendix-6 (type design for Kilometer post) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 4 nos. of 12mm dia M.S. rods in vertical direction of length 1085mm and 7nos. Of 10mm dia M.S. rods in horizontal direction of length 520mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 2.000 | 3844.660 | |
3.12.01.2 | RNPlate: Providing, fitting and fixing rectangular Road Name Plate as per standard drawing enumerated in Appendix-6 (type design for Road Name Plate) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 7 nos. of 12mm dia M.S. rods in vertical direction of length 1125mm and 8nos. Of 10mm dia M.S. rods in horizontal direction of length 970mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 1.000 | 7274.690 | |
5.02.01.2 | Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer's approval shall not relieve the contractor of his responsibilities and obligations under the contract. [PWD 02.1] Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead [PWD 02.1.2] | cum | 18.216 | 153.001 | |
5.02.08.1 | Sand filling in foundation trenches and plinth with sand having minimum F.M. 0.5 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. [PWD 02.10.1] | cum | 2.384 | 1069.001 | |
5.02.13 | Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other means including loading and unloading at both ends, leveling, watering and compacting to achive minimum dry density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer-in-charge [PWD 02.15] | cum | 10.908 | 689.001 | |
5.05.01.04 | RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Cornice, railing, drop wall, louver, fins, sunshade, false ceiling, waffle and ribbed floor slab etc. up to ground floor (PWD 07.1.4) | cum | 0.378 | 9113.001 | |
5.05.11.01 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) Individual and combined footing (PWD 07.12.1) | sqm | 11.712 | 568.001 | |
5.05.11.03 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) Foundation beam (PWD 07.12.3) | sqm | 18 | 486.001 | |
5.05.11.04 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) Pedestal, column, column capital, lift wall and wall up to ground floor (PWD 07.12.4) | sqm | 36 | 517.001 | |
5.05.11.05 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) Tie beam and lintel: ground floor (PWD 07.12.5) | sqm | 9.18 | 535.001 | |
1.16.1 | Supplying fitting & fixing 18mm thick Marble stone Name Plate. | each set | 1 | 1250.001 | |
5.12.06 | Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling, R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.5] | sqm | 29.6 | 272.001 | |
5.12.03 | Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall with cement (1:4) up to 150 mm below ground level including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.2] | sqm | 1.2 | 340.001 | |
5.09.01.21 | Supply and installation of 0.457 mm thick corrugated galvanized iron sheet (Bangladesh made) having min weight 63-65 kg per bundle (2'-6-inch width, 70 ? 72 rft long) fitted and fixed on M.S. sections with 'J' hook or wooden purlin with screws, limpet washers and putty etc. (up to level-4) all complete and accepted by the Engineer-in-charge.(PWD 10.21) | sqm | 63 | 569.001 | |
5.09.01.22.1 | m0.27 mm thick galvanized iron plain sheet ridging with 300 mm lap on either side fitted and fixed with galvanized bolts and nuts etc. all complete and accepted by the Engineer-in-charge.(PWD 10.22) Galvanized(PWD 10.22.1) | m | 18.4 | 459.001 | |
5.09.01.06 | Supply, fabrication and installation of hot rolled structural grade steel channel and angle in roof truss or any form of structure of any thickness conforming to ASTM A36 with a minimum yield strength of 250 MPa, including the cost of testing, application of red/grey-oxide primer etc. (up to level-4) all complete as per drawing, specification and direction of Engineer-in-charge. (PWD 10.6) | kg | 354.409 | 129.001 | |
5.03.01 | One layer brick flat soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge [PWD 03.1.1] | sqm | 29.24 | 492.001 | |
5.04.19 | Providing 125 mm thick brick work in superstructure (partition walls) with cement sand (F.M. 1.2) mortar (1:4) with 10 hole machine made ceramic bricks of approved size having uniform colour, carefully laid in cement mortar of uniform width & depth of joints, true to vertical and horizontal lines including racking out joints, filling the interstices with same mortar, making bond with connected walls, cleaning, soaking brick at least 24 hours and washing of sand, curing 7 days in all floors, including cost of water, electricity and other charges accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD 04.19) | sqm | 14.4 | 1855.001 | |
5.02.01.2 | Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer's approval shall not relieve the contractor of his responsibilities and obligations under the contract. [PWD 02.1] Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead [PWD 02.1.2] | cum | 12.084 | 153.001 | |
5.02.13 | Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other means including loading and unloading at both ends, leveling, watering and compacting to achive minimum dry density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer-in-charge [PWD 02.15] | cum | 10.2 | 689.001 | |
5.12.06 | Minimum 6 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to ceiling, R.C.C. columns, beams, surface of stair case, sunshades, cornices, railings, drop wall, louvers, fins and finishing the corners and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.5] | sqm | 30.115 | 272.001 | |
5.12.02 | Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to outer surface of wall, finishing the corner and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.1.2] | sqm | 72 | 298.001 | |
5.16.14 | Colour wash with yellow orchard/any other colour pigment by two coats over a prime coat of white wash, lime mixture prepared at least 12 hours before use, slacking stone lime, supplying of gums, blue, stirring thoroughly, removing the floating materials from the mixer, surface cleaning to free from all foreign materials before application of each coat, applying one vertical and one horizontal wash for each coat and successive coat is to be applied after drying up of previous coat including hair brass, providing necessary scaffolding and cleaning plinth, floors, doors, windows, portions and ventilators by washing, rubbing, oiling if necessary after white wash for all floors including cost of water, electricity and other charges etc. complete in all respect in all floors and accepted by the Engineer-in-charge. [PWD 16.13] | sqm | 99.943 | 27.001 | |
5.03.02.1 | Lean / blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M) [PWD 03.4] Lean / blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 [PWD 03.4.1] | cum | 2.617 | 7586.001 | |
5.15.02.1 | Supplying, fitting and fixing country made mirror polished homogeneous floor tiles complying BDS ISO 13006: 2015, water absorption = 0.5%, modulus of rupture (MOR) = 27 N/mm2, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:4) base and raking out the joints with white cement including cutting and laying the tiles in proper way and finishing with care etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD BW 06.2) GP (mirror polished) 400 mm x 400 mm floor tiles | sqm | 42.21 | 1600.001 | |
5.04.16 | 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD 04.16) | sqm | 36 | 1129.001 | |
5.02.01.2 | Earth work in excavation in all kinds of soil for foundation trenches including layout, providing center lines, local bench-mark pillars, levelling, ramming and preparing the base, fixing bamboo spikes and marking layout with chalk powder, providing necessary tools and plants, protecting and maintaining the trench dry etc., stacking, cleaning the excavated earth at a safe distance out of the area enclosed by the layout etc. all complete and accepted by the Engineer-in-charge, subject to submit method statement of carrying out excavation work to the Engineer-in-charge for approval. However, engineer's approval shall not relieve the contractor of his responsibilities and obligations under the contract. [PWD 02.1] Earthwork in excavation in foundation trenches up to 1.5 m depth and maximum 10 m lead [PWD 02.1.2] | cum | 7.857 | 153.001 | |
1.16.1 | Supplying fitting & fixing 18mm thick Marble stone Name Plate. | each set | 1 | 1250.001 | |
5.03.03.1 | Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M) [PWD 03.5] Mass concrete in foundation (1:2:4) with brick chips and local sand of F.M. 1.2. [PWD 03.5.1] | cum | 2.678 | 8639.001 | |
5.04.03 | Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) in exterior walls including filling the interstices with mortar, raking out joints, cleaning and socking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water, electricity and other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD 04.3) | cum | 1.964 | 8027.001 | |
1.01.01.01 | Construction of Buming Chulli for Dead body with nessiasary materials Brodgaije Raill,Raill sections as I Circular, Tube, Tree, Nut Bolt of work in truss or any other member as per desing, hoisting fitting and fixing podition with bolts and nut or rivets or Heavy welded including cost of all meterials and providing two coats anticorosive paint over a paint cost red oxide paint etc. all complete as per direction of the EIC.. | each set | 1 | 86300.001 | |
4.15.03.03 | Supplying fitting and fixing railing & rail post made of various dia MS pipes of standard thickness for normal, ornamental Bridge or any other structure including required ms plate, nutbolt, cutting, welding, painting with anticorrosive paint, laying in position etc. all complete as per design, drawing, spacification & the direction of the E-I-C. 100mm dia. and wall thickness 4mm | m | 36 | 2327.001 | |
5.05.01.01 | RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Individual & combined footing, pile cap, raft/mat, floor slab and foundation beam up to plinth level (PWD 07.1.1) | cum | 4.966 | 8449.001 | |
5.12.03 | Minimum 12 mm thick cement sand (F.M. 1.2) plaster with neat cement finishing to plinth wall with cement (1:4) up to 150 mm below ground level including washing of sand, finishing the edges and corners and curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.2] | sqm | 22.55 | 340.001 | |
5.05.01.02 | RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Pedestal, column, column capital, lift wall and wall up to ground floor (PWD 07.1.2) | cum | 0.65 | 8781.001 | |
5.16.14 | Colour wash with yellow orchard/any other colour pigment by two coats over a prime coat of white wash, lime mixture prepared at least 12 hours before use, slacking stone lime, supplying of gums, blue, stirring thoroughly, removing the floating materials from the mixer, surface cleaning to free from all foreign materials before application of each coat, applying one vertical and one horizontal wash for each coat and successive coat is to be applied after drying up of previous coat including hair brass, providing necessary scaffolding and cleaning plinth, floors, doors, windows, portions and ventilators by washing, rubbing, oiling if necessary after white wash for all floors including cost of water, electricity and other charges etc. complete in all respect in all floors and accepted by the Engineer-in-charge. [PWD 16.13] | sqm | 99.943 | 27.001 | |
5.02.08.1 | Sand filling in foundation trenches and plinth with sand having minimum F.M. 0.5 in 150 mm layers including leveling, watering and compaction to achieve minimum dry density of 95% with optimum moisture content (Modified proctor test) by ramming each layer up to finished level as per design supplied by the design office only, all complete and accepted by the Engineer-in-charge. [PWD 02.10.1] | cum | 4.408 | 1069.001 | |
3.11.33.02 | Brick (BP-TW): Construction and Installation in position brick palisading work as per standard drawing enumerated in Appendix-6 (type design for protective work) with 375mm thick Brick Masonry work upto 500 mm height from bottom & rest 500 mm height 250mm thick Brick Masonry work and Pre cast RCC Post of 03 (three) meter long (150mmX150mm) and capping beam (200mmX150mm) using 20mm down graded crushed stone chips (LAA value not exceeding 30), sand (minimum FM 2.5) and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N to attain a minimum 28 days cylinder crushing compressive strength 25.00 Mpa ( mixing ratio 1:1.5:3 & maximum water cement ratio 0.4) as per standard practice of code AASHTO/ASTM including supplying, fabricating and binding of 400/420 Grade MS deformed bar of required size, length and spacing. The pre-cast post must be driven by suitable monkey/drop hammer in 5/6 th of its total length @ 1 m c/c into the ground laying on proper alignment. Brick Masonry work in cement mortar (1:3), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including flush pointing at front face of the brick wall with cement mortar (1:2), curing for requisite period, including excavating minimum 575mm depth foundation trenches for brick wall and laying one layer polythene sheet, casting 75mm thick cement concrete (1:3:6) below the 375 mm brick work by means approved designed including form work, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. (Unit cost includes Brick wall, all casting work, reinforcement, its fabrication, shuttering, curing for 28 days, driving of the post, lab testing charges as per design and all other incidental charges, etc.) without capping beam | m | 20 | 6454.881 | |
5.02.13 | Earth filling in foundation trenches and plinth in 150 mm layers with carted earth carried by truck or by any other means including loading and unloading at both ends, leveling, watering and compacting to achive minimum dry density of 95% with optimum moisture content (modified proctor test) including local carriage each layer up to finished level including cost of water and test (carried from beyond 300 m) etc. all complete and accepted by the Engineer-in-charge [PWD 02.15] | cum | 15.39 | 689.001 | |
5.04.16 | 125 mm brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD 04.16) | sqm | 54 | 1129.001 | |
5.03.01 | One layer brick flat soling in foundation or in floor with first class/picked jhama bricks (BDS 208) including preparation of bed and filling the interstices with local sand, leveling etc. complete and accepted by the Engineer-in-charge [PWD 03.1.1] | sqm | 50.41 | 492.001 | |
5.03.03.2 | Mass concrete (1:2:4) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by Engineer-in-charge. (Cement: CEM-II/B-M) [PWD 03.5] Mass concrete in floor (1:2:4) with brick chips and local sand of F.M. 1.2. [PWD 03.5.2] | cum | 3.125 | 8589.001 | |
5.05.11.07 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) Floor and roof slab up to ground floor (PWD 07.12.7) | sqm | 85.75 | 590.001 | |
4.15.03.02 | Supplying fitting and fixing railing & rail post made of various dia MS pipes of standard thickness for normal, ornamental Bridge or any other structure including required ms plate, nutbolt, cutting, welding, painting with anticorrosive paint, laying in position etc. all complete as per design, drawing, spacification & the direction of the E-I-C. 75mm dia. and wall thickness 4mm | m | 44.8 | 1446.971 | |
5.03.02.1 | Lean / blinding concrete (1:3:6) in foundation or in floor with cement, sand (F.M. 1.2) and picked jhama brick chips including breaking of chips, screening, mixing, laying, compacting to required level and curing for at least 7 days including the supply of water, electricity, costs of tools & plants and other charges etc. all complete and accepted by the Engineer-in-charge.(Cement: CEM-II/B-M) [PWD 03.4] Lean / blinding concrete in foundation (1:3:6) with cement, brick chips and sand of F.M. 1.2 [PWD 03.4.1] | cum | 5.741 | 7586.001 | |
5.09.01.06 | Supply, fabrication and installation of hot rolled structural grade steel channel and angle in roof truss or any form of structure of any thickness conforming to ASTM A36 with a minimum yield strength of 250 MPa, including the cost of testing, application of red/grey-oxide primer etc. (up to level-4) all complete as per drawing, specification and direction of Engineer-in-charge. (PWD 10.6) | kg | 242.04 | 129.001 | |
5.04.01 | Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:6) in foundation and plinth, filling the joints/interstices fully with mortar, racking out the joints, cleaning and soaking the bricks at least for 24 hours before use and curing at least for 7 days etc. all complete including cost of water, electricity and other charges and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) (PWD 04.1) | cum | 5.535 | 7181.001 | |
3.01.2 | BC(150mm): Earth work in box cutting on road crest up to 150mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soil to a safe distance or spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing,watering and compacting the sub-grade soil by manual means etc. all complete as per direction of the E-I-C. | sqm | 764.000 | 30.680 | |
3.02.1.1 | Sand (FM 0.50) filling on the road bed in the improved sub-grade with sand (minimum FM 0.5) free from dust, earth, other vegetable growth, foreign materials etc. including supplying all materials, spreading, watering, compacting by appropriate mechanical means to obtain a minimum Soaked CBR 8% or Design CBR at minimum compaction 98% of Maximum Dry Density (MDD) (Modified Proctor), etc. all complete as per direction of the E-I-C. | cum | 76.400 | 938.810 | |
3.04.3.1 | EE (75mm): Brick on end edging (75 mm across the road) with first class or picked jhama bricks and filling the gaps with fine sand (F.M. 0.80) including cutting trenches, true to level and grade, removing earth, refilling and ramming the sides properly including cost of all materials and accepted by the Engineer-in-charge. [PWD 24.7.1] | m | 764.000 | 159.910 | |
3.08.4.1 | SBFS(FM-0.50): Providing Single layer brick flat soling (BFS) with 1st class or picked bricks, true to level, maintaining camber/super elevation and grade including carrying bricks, filling the interstices tightly with sand of minimum FM 0.50, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. | sqm | 764.000 | 522.080 | |
2.05.1 | Leveling and dressing the embankment crown, road flanks, etc. in maintenance work by earth cutting and filling as necessary with maintaining proper slope and camber including compaction etc. all complete as per direction of the E-I-C. | sqm | 463.864 | 14.110 | |
N.05.01.01 | Writing,supplying,fitting & fixing Name plat etc. all complete as per direction of the Engineer-in-Charge. | each | 1.000 | 1500.000 | |
5.05.11.06 | FORM WORK (Steel) :Centering and shuttering, including strutting, propping etc. (The formwork must be rigid enough both in and out of plane, to make the concrete surface true to the designed shape and size by using necessary MS sheets of minimum 16 BWG, angles of minimum size 40 mm x 40 mm x 5 mm, flat bars etc.) and removal of form for: (PWD 07.12) T-beam, L-beam and rectangular beam etc up to ground floor (PWD 07.12.6) | sqm | 57.985 | 569 | |
N.P.01 | Supplying Fitting & Fixing marble Stone Name Plate etc. all Complete as par direction of the EIC. | LS | 1 | 5000 | |
Sign.B01 | Supplying Fitting & Fixing Sign Board Size: 0.838x1.066 Stander hight:0.90m In/c cost ETC. | LS | 1 | 2000 | |
2.02.2.02 | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 95% Compaction | cum | 20.040 | 369.660 | |
3.04.2.1 | ReEE(75mm): Labour charge for Resetting the brick on end edging (75mm across) with 1st class/picked bricks, including cutting trenches true to level & maintaining grade, removing earth, re-filling & ramming the sides properly, including supplying and filling the gaps with local sand, etc. all complete as per direction of the E-I-C. | m | 2047.400 | 16.040 | |
3.10.01.2 | HBPMM: Preparation of hard bed by scarifying and loosening of existing top (bituminous) surface, including base/sub-base course materials up to the depth of 75mm (minimum) using mechanical means, breaking dismantled material into specified sizes (less than 40mm), with supplying of extra fresh base course materials of required specification (if required) including spreading, leveling, dressing of loose material uniformly for maintaining camber & grade, watering if needed, rolling with 8 to 10 MT road roller to give compaction to 100% of MDD as obtained by standard proctor test etc. all complete in all respect as per direction of the Engineer-in-charge. (Rate is excluding the cost of additional material supplied) | sqm | 3037.225 | 34.150 | |
3.11.02.2 | BW(1:4): Brick works with first class bricks with cement sand (F.M. 1.2) mortar (1:4) in exterior walls including filling the interstices with mortar, raking out joints, cleaning and socking the bricks at least for 24 hours before use and washing of sand, necessary scaffolding, curing at least for 7 days etc. all complete including cost of water, electricity and other charges (measurement to given as 250 mm width for one brick length and 375 mm for one brick and a half brick length) accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) [PWD 04.3] | cum | 2.250 | 8027.000 | |
4.09.03.04.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For T-girder & slab type super-structure including cross girders, side walk, curb and wheel guard of bridges Height up to 5 m | cum | 1.350 | 23407.810 | |
4.11.01.02 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET. Grade B400C-R/ B400CWR/B400DWR: Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2016 with minimum yield strength, fy (ReH) = 400 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 17% and 8% respectively. | kg | 344.966 | 104.340 | |
5.12.01 | Minimum 12 mm thick cement sand (F.M. 1.2) plaster (1:4) with fresh cement to both inner-and outer surface of wall, finishing the corner and edges including washing of sand, cleaning the surface, curing at least for 7 days, cost of water, electricity, scaffolding and other charges etc. all complete in all respect as per drawing and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) ground floor. [PWD 15.1.1] | sqm | 14.698 | 281.000 | |
3.11.33.01 | Brick (BP-TW): Construction and Installation in position brick palisading work as per standard drawing enumerated in Appendix-6 (type design for protective work) with 375mm thick Brick Masonry work upto 500 mm height from bottom & rest 500 mm height 250mm thick Brick Masonry work and Pre cast RCC Post of 03 (three) meter long (150mmX150mm) and capping beam (200mmX150mm) using 20mm down graded crushed stone chips (LAA value not exceeding 30), sand (minimum FM 2.5) and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-M 42.5N to attain a minimum 28 days cylinder crushing compressive strength 25.00 Mpa ( mixing ratio 1:1.5:3 & maximum water cement ratio 0.4) as per standard practice of code AASHTO/ASTM including supplying, fabricating and binding of 400/420 Grade MS deformed bar of required size, length and spacing. The pre-cast post must be driven by suitable monkey/drop hammer in 5/6 th of its total length @ 1 m c/c into the ground laying on proper alignment. Brick Masonry work in cement mortar (1:3), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including flush pointing at front face of the brick wall with cement mortar (1:2), curing for requisite period, including excavating minimum 575mm depth foundation trenches for brick wall and laying one layer polythene sheet, casting 75mm thick cement concrete (1:3:6) below the 375 mm brick work by means approved designed including form work, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. (Unit cost includes Brick wall, all casting work, reinforcement, its fabrication, shuttering, curing for 28 days, driving of the post, lab testing charges as per design and all other incidental charges, etc.) with capping beam | m | 39.000 | 7459.890 | |
2.02.3.01 | EFW(CE): Earth filling work with specified soil in any type of embankment, where earth shall be carried by truck/boat or any other means, supplied at contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than150mm in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment, with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. The item is applicable when earth is supplied and arranged by the contractor from a distance beyond 200m from the end of right of way. Outside municipal area, 85% Compaction | cum | 50.500 | 306.910 | |
2.02.2.01.A | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 85% Compaction | cum | 185.420 | 257.860 | |
3.04.3.1 | EE (75mm): Brick on end edging (75 mm across the road) with first class or picked jhama bricks and filling the gaps with fine sand (F.M. 0.80) including cutting trenches, true to level and grade, removing earth, refilling and ramming the sides properly including cost of all materials and accepted by the Engineer-in-charge. [PWD 24.7.1] | m | 51.500 | 133.000 | |
3.06.1.1 | PCHD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen to be prepared by cutting back 60/70 penetration grade straight run bitumen (conforming to the requirements of ASTM/ AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of the surface and will be decided by field trials, the correct quantity that is completely absorbed within 24 hours including carefully cleaning of the surface of the granular base material to be primed and spraying cut back bitumen at a temperature from 100°C to 120°C by appropriate hand device, etc. complete as per direction of the E-I-C. | sqm | 2804.000 | 114.090 | |
2.02.2.01 | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 85% Compaction | cum | 6.929 | 257.680 | |
3.10.01.1 | PPLM: Preparation of Pothole for small patch works (pothole, edge breaking, etc.) by cutting, scarifying and loosening of existing damaged Base/sub- base Course materials up to the depth of 150mm at the pothole areas in order to make regular shape of the pothole including leveling, dressing and compacting manually where mechanical compactors are not suitable to give a smooth surface including brushing, removing & stacking all debris at a safe distance etc. all complete in all respect as per direction of the Engineer-in-charge. | sqm | 37.950 | 21.850 | |
3.10.03 | 25mmSGSS: Providing 25mm thick (average) grouting with 20mm downgraded broken stone shingles (LAA value not exceeding 35) and using 60/70 penetration grade straight run bitumen conforming to the requirements of ASTM/ AASHTO, spraying tack coat @ 0.50kg per sqm over the cleaned road surface and laying, spreading stone shingles @0.028cum per sqm (loose) on the road surface, maintaining proper camber, level, grade, super elevation and spraying hot bitumen @1.50kg per sqm uniformly, including rolling hard to full compaction with 8 to 10 MT road roller including cleaning the surface & heating bitumen from 140°C to 160°C temperature and spreading crushed stone chips/Sand (FM-1.80) @0.006cum per sqm road surface etc. all complete in all respect as per direction of the Engineer-in-charge. | sqm | 37.950 | 447.180 | |
3.06.2.2 | TCHD@0.75: Providing tack coat @0.75kg/sqm with 60/70 penetration grade straight run bitumen complying with the requirements of ASTM/AASHTO applied by appropriate hand device at a temperature between 175°C and 185°C including heating bitumen, surface cleaning, etc. all complete as per direction of the E-I-C. | sqm | 2962.050 | 70.350 | |
3.10.02 | SB: Providing and applying sand blinding with sand of minimum FM 0.80 @0.005 cum per sqm on prepared road surface, including supplying of all material, their carriage, labours, tools and equipment, etc. all complete in all respect as per direction of the Engineer-in-charge. | sqm | 1365.330 | 5.350 | |
3.05.2.3 | B&SBC: Labour charge for breaking and spreading 1st class & picked brick chips including cost of bricks carrying, breaking into specified sizes including screening & spreading uniformly on the road surface maintaining grade, camber and super elevation, etc. all complete as per direction of the E-I-C. 50mm downgraded | cum | 25.107 | 338.470 | |
3.05.1.3 | S&SBC: Supplying and spreading 1st class and picked brick chips (LAA value not exceeding 40) including cost of bricks carrying breaking into specified sizes including screening & spreading uniformly on the road surface maintaining grade, camber and super elevation, etc. all complete as per direction of the E-I-C. 50mm downgraded | cum | 111.085 | 3753.230 | |
3.05.6.01 | CWBM(iSSM): Labour charge for compacted WBM base course with crusher run aggregate made of well burnt picked and 1st class bricks or stone having compacted thickness as per specifications including local handling, hand packing, watering, dry rolling followed by wet rolling in layers of specified loose thickness with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction including supplying choking/screening material as filler material @0.012cum/sqm or as required etc. all complete as per direction of the Engineering-in-charge. After adequate dry rolling, spreading of choking/screening material on the surface, sprinkling of water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and Payment will be made on compacted thickness. The rate excludes the cost of brick aggregates.Degree of compaction: minimum 98% of MDD (Modified Proctor) | cum | 102.400 | 574.730 | |
3.10.01.2 | HBPMM: Preparation of hard bed by scarifying and loosening of existing top (bituminous) surface, including base/sub-base course materials up to the depth of 75mm (minimum) using mechanical means, breaking dismantled material into specified sizes (less than 40mm), with supplying of extra fresh base course materials of required specification (if required) including spreading, leveling, dressing of loose material uniformly for maintaining camber & grade, watering if needed, rolling with 8 to 10 MT road roller to give compaction to 100% of MDD as obtained by standard proctor test etc. all complete in all respect as per direction of the Engineer-in-charge. (Rate is excluding the cost of additional material supplied) | sqm | 1196.000 | 34.150 | |
3.06.4.2.01 | 25mmDC: Providing 25mm thick (minimum) compacted pre-mixed bituminous surfacing - wearing course with 16mm downgraded crushed stone chips complying with the specified grading requirement of the relevant item of Road Design standards, of LAA value <=30%, water absorption not >2%, flakiness index not >35% mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen and stone-chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively before mixing. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The bitumen and stone-chips mixture shall be laid uniformly on the road surface in single appropriate layer to give specified compacted thickness maintaining specified camber, grade and super-elevation. The mixture should be rolled at a temperature not below 90°C with Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to full compaction, including supplying of all materials, their carriage, labourers tools and equipment etc. all complete as per the direction of the E-I-C. The bitumen in the mix shall be between 5.0% to 5.5% by weight of total mix or as determined by job mix design. (In order to achieve the specified grading a blending of nominal maximum size of 16mm, 12mm, 6mm crushed stone chips and stone dust is suggested and proportion will have to determine by the laboratory analysis). [Bitumen Grade 60/70] | sqm | 6516.200 | 543.470 | |
5.09.01.21 | Supply and installation of 0.457 mm thick corrugated galvanized iron sheet (Bangladesh made) having min weight 63-65 kg per bundle (2'-6-inch width, 70 ? 72 rft long) fitted and fixed on M.S. sections with 'J' hook or wooden purlin with screws, limpet washers and putty etc. (up to level-4) all complete and accepted by the Engineer-in-charge.(PWD 10.21) | sqm | 78.26 | 569.001 | |
5.05.01.03 | RCC WORKS: 1:2:4 (measured on gross concrete section) (f'c = 19 MPa, minimum f'cr = 26 MPa in nominal mix 1:2:4), with brick-chips (Sand of F.M. 1.2 and F.M. 2.2 in equal proportion) Reinforced cement concrete works with minimum cement content relates to mix ratio 1:2:4 having maximum water cement ratio = 0.45 and minimum f'cr = 26 MPa, satisfying a specified compressive strength f'c= 19 MPa at 28 days on standard cylinders as per standard practice of Code ACI/BNBC/ASTM, cement conforming to BDS EN-197-1-CEM-I, 52.5N (52.5 MPa) / ASTM-C 150 Type ? I, best quality sand [50% quantity of best local sand (F.M. 1.2) and 50% quantity of Sylhet sand or coarse sand of equivalent F.M. 2.2] and 20 mm down well graded picked jhama brick chips conforming to ASTM C-33 including conducting necessary tests, breaking chips and screening, making and placing shutter in position maintaining true to plumb, making shutter water-tight properly, placing reinforcement in position; mixing in standard mixer machine with hopper fed by standard measuring boxes, casting in forms, compacting by vibrator machine and curing at least for 28 days, removing centering-shuttering after specified time approved; including cost of water, electricity, other charges etc. all complete, approved and accepted by the Engineer-in-charge. (Rate is excluding laboratory test fees, the cost of reinforcement and its fabrication, placing, binding etc. and the cost of shuttering & centering). (PWD 07.1) Floor / roof slab, T-beam, L-beam and rectangular beam, tie beam, lintel, stair case slab and step etc. up to ground floor (PWD 07.1.3) | cum | 10.204 | 8582.001 | |
5.06.01.02 | Supplying, fabrication and fixing to detail as per design : ribbed or deformed bar reinforcement (excluding laboratory test fees) for Reinforced concrete, produced and marked in accordance with BDS ISO 6935-2:2016 (or standard subsequently released from BSTI) including straightening and cleaning rust, if any, bending and binding in position with supply of G.I. wires,conducting necessary laboratory tests etc. (excluding splices or laps) complete in all respect and accepted by the Engineer-in-charge (Measurement shall be recorded only on standard mass per unit length of bars, while dia of bars exceeds its standard) . (PWD 08.1) Grade 400 (B400DWR / B420DWR: complying BDS ISO 6935-2:2016 / ASTM A615) ribbed or deformed bar produced and marked according to Bangladesh standard, with minimum yield strength, fy (ReH)= 400 MPa but fy not exceeding 480 MPa and whatever is the actual yield strength within allowable limit as per BNBC/ ACI 318, the ratio of ultimate tensile strength fu to yield strength fy, shall be at least 1.25 and minimum elongation after fracture and minimum total elongation at maximum force is 17% and 8% respectively : up to ground floor. . (PWD 08.1.2) | kg | 1132.07 | 99.001 | |
3.04.1.1 | PiEE(75mm): Labour charge for picking up the existing brick on end edging (75mm across) including staking the materials at a specified distance, etc. all complete as per direction of the E-I-C. | m | 803.000 | 8.620 | |
2.02.2.01 | EFW(AE): Earth filling work with specified soil in any type of embankment, where earth shall be arranged by the contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% of Maximum Dry Density (MDD) at Optimum Moisture Content (OMC), with reference to laboratory density test AASHTO standard hammer by throwing earth in layers not more than 150mm in each layer in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm and other foreign particles stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. 85% Compaction | cum | 26.524 | 257.680 | |
3.06.1.2 | PCMD@1.2: Providing Prime coat @1.2 liter/sqm with cut back bitumen to be prepared by cutting back 60/70 penetration grade straight run bitumen (conforming to the requirements of ASTM/ AASHTO in the ratio of 100 parts by volume of bitumen to 40-60 parts by volume of kerosene depending on the porosity of the surface and will be decided by field trials, the correct quantity that is completely absorbed within 24 hours including carefully cleaning of the surface of the granular base material to be primed and spraying cut back bitumen at a temperature from 100°C to 120°C by mechanical distributor, etc. complete as per direction of the E-I-C. | sqm | 3080.836 | 115.610 | |
3.03.3.1 | SBBC(FM-0.5): Providing compacted aggregate sand sub-base course with 38mm down Crusher run 1st class bricks/picked chips of LAA value not exceeding 40 & sand of minimum FM 0.50 mixed in proportion 1:1 by volume placed in layer(s), mixing properly, watering, compacting with 8~10 tonne road roller to attain each layer's minimum soaked CBR 30% or Design CBR at minimum compaction 98% of MDD (Modified Proctor) including supplying of all materials, labourers, tools and equipment etc. all complete as per direction of the E-I-C. | cum | 289.986 | 3492.650 | |
3.05.1.2 | S&SBC: Supplying and spreading 1st class and picked brick chips (LAA value not exceeding 40) including cost of bricks carrying breaking into specified sizes including screening & spreading uniformly on the road surface maintaining grade, camber and super elevation, etc. all complete as per direction of the E-I-C. 40mm downgraded | cum | 376.200 | 3880.010 | |
3.06.4.1.01 | 25mmBC: Providing 25mm thick (minimum) compacted pre-mixed bituminous carpeting to be prepared using 16mm downgraded stone-chips (LAA value not exceeding 30%) to comply the gradation as specified, mixed with heated bitumen of 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen and stone-chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively before mixing. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The bitumen and stone-chips mixture shall be laid uniformly, maintaining specified camber, grade and super-elevation, only on the prepared and accepted base or surface in a single appropriate layer to give the specified compacted thickness. The mixture should be rolled with appropriate by Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to full compaction. The rolling temperature shall be maintained not below 90°C including supplying of all materials, their carriage, labourers, tools and equipment etc. all complete as per direction of the E-I-C. The bitumen in the mix shall be minimum @4.5% to 5.5% by weight of total mix or as determined by job mix design. (In order to achieve the specified grading a blending of nominal maximum size of 16mm, 12mm, 6mm crushed stone chips and stone dust is suggested and proportion will have to determine by the laboratory analysis). [Bitumen Grade 60/70] | sqm | 1881.000 | 494.420 | |
3.06.3.1.01 | 7mmSC: Providing 7mm thick (minimum) compacted pre-mixed bituminous seal coat to be prepared using 6.33mm down crushed stone chips & stone dust blended together to comply the gradation as specified in the relevant item of Road Design Standards, mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO, minimum @5.5% by weight of total mix or as determined by job mix design. The bitumen and chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The mixture of bitumen and chips shall be laid uniformly on the road surface in appropriate layer so as to produce the specified compacted thickness, rolling at a temperature not bellow 90°C with appropriate Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to the desired compaction, including supplying of all materials, their carriage, labourers tools and equipment etc. all complete as per direction of the E-I-C [Excluding the cost of applying Prime/Tack coat]. [Bitumen Grade 60/70] | sqm | 1881.000 | 150.940 | |
3.12.01.1 | kmPost: Providing, fitting and fixing rectangular Kilometer Post as per standard drawing enumerated in Appendix-6 (type design for Kilometer post) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 4 nos. of 12mm dia M.S. rods in vertical direction of length 1085mm and 7nos. Of 10mm dia M.S. rods in horizontal direction of length 520mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 1.000 | 3265.680 | |
4.06.02 | Single layer brick flat soling with 1st class or picked kiln burnt bricks in foundation, filling the interstices tightly with sand of minimum FM 0.50, watering, leveling, dressing, etc. all complete as per instruction of the E-I-C. | sqm | 18.900 | 455.810 | |
4.06.04 | PCC-17: Plain cement concrete work in foundation with minimum compressive strength of 17 MPa at 28 days (sugessted mix proportion 1:2:4 & maximum w/c ratio 0.45) on standard cylinder as per standard practice of Code AASHTO/ ASTM/ and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, sand of minimum FM 1.8 and 20mm down well graded 1st class/ picked brick chips (LAA value not exceeding 40) comforming to ASTM C 33 including breaking bricks into chips, shuttering, mixing by concrete mixer machine, casting, laying compacting and curing for the requisite period etc. all complete as per direction of the E-I-C. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. | cum | 1.418 | 9723.600 | |
4.11.01.03 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET. Grade B420DWR: Ribbed or Deformed bar produced and marked as per ISO 6935-2:2016/ ASTM A706M - 16 with minimum yield strength, fy(ReH) = 420 MPa but fy(ReH) not exceeding 540 MPa, the ratio of ultimate tensile strength, fu(Rm) to actual yield strength, fy(ReH) shall be at least 1.25 and minimum elongation in 200mm shall be at least 14% for bar sizes 10mm through 20mm, at least 12% for bar sizes 22mm through 32mm and at least 10% for bar sizes 40mm and 50mm. | kg | 862.040 | 104.340 | |
2.02.1.2 | EFW: Earth work in road embankment up to a lift of 1.5 m in all kinds of soil including cutting and throwing earth in layers not exceeding 150 mm in thickness, breaking clods up to 40 mm size in each layer, ramming, leveling and dressing as per required side slope and alignment with earth borrowed from the road side govt. acquired land for any leads and maintaining the embankment true to level and side slopes as per profiles for one year from the date of completion including making dug, bailing, profiling etc. complete and accepted by the Engineer-in-charge. [PWD 24.1] For additional lift of 1 m beyond 1.5 m up to 2.5 m | cum | 80.000 | 209.000 | |
3.04.3.2 | EE(125mm): Brick on end edging (125mm across) with 1st class/picked bricks including cutting trenches true to level & maintaining grade, removing earth, re-filling & ramming the sides properly, including supplying and filling the gaps with local sand, etc. all complete as per direction of the E-I-C. | m | 2202.000 | 190.410 | |
3.05.6.01 | CWBM(iSSM): Labour charge for compacted WBM base course with crusher run aggregate made of well burnt picked and 1st class bricks or stone having compacted thickness as per specifications including local handling, hand packing, watering, dry rolling followed by wet rolling in layers of specified loose thickness with 8~10 tonne road roller to attain each layer's minimum soaked CBR 80% or Design CBR at specified degree of compaction including supplying choking/screening material as filler material @0.012cum/sqm or as required etc. all complete as per direction of the Engineering-in-charge. After adequate dry rolling, spreading of choking/screening material on the surface, sprinkling of water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and Payment will be made on compacted thickness. The rate excludes the cost of brick aggregates.Degree of compaction: minimum 98% of MDD (Modified Proctor) | cum | 507.488 | 574.730 | |
3.12.01.2 | RNPlate: Providing, fitting and fixing rectangular Road Name Plate as per standard drawing enumerated in Appendix-6 (type design for Road Name Plate) with Reinforced Cement Concrete (1:2:4) Plate with 20mm down well graded brick chips in correct position true to line and level, including cost of providing 7 nos. of 12mm dia M.S. rods in vertical direction of length 1125mm and 8nos. Of 10mm dia M.S. rods in horizontal direction of length 970mm, RCC Plate firmly fixed to the ground by means properly designed foundation as per approved drawing with 1st class bricks work in cement mortar (1:4), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including 6mm thick plaster (1:4) in all exposed portion, curing for requisite period, with two coat of painting on the exposed portion of the post with best quality synthetic enamel paint of approved brand of different shades over a coat of priming, including carriage of the post to the site with loading & unloading and printing of letters and numbers, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. Rate is inclusive of cost of all materials, labour and all incidental charges in this connection. | each | 2.000 | 6225.980 | |
3.08.1.2 | PiHBB: Labour charge for picking up the existing HBB and staking the materials at a specified distance, etc. all complete as per direction of the E-I-C. | sqm | 104.000 | 30.770 | |
4.06.01.02 | Sand filling on the prepared foundation bed with sand of specified FM in layers not more than 150mm thick including necessary carriage, leveling, watering and ramming to achieve minimum dry density (MDD) of 95% STD compaction with optimum moisture content (OMC) by ramming each layer up to finished level as per direction of E-I-C. Sand of Minimum FM 1.2 | cum | 2.393 | 1264.290 | |
4.09.03.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For pile caps, abutment base, facing elements of Reinforced/ Mechanically Stabilized Earth Structure, bottom slab of Box Culvert etc. | cum | 3.755 | 15568.240 | |
4.11.01.02 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET. Grade B400C-R/ B400CWR/B400DWR: Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2016 with minimum yield strength, fy (ReH) = 400 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 17% and 8% respectively. | kg | 1201.540 | 104.340 | |
4.13.01 | CWC: Providing and laying wearing course on deck slab of bridge with minimum cement content ralates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, Coarse sand of minimum FM 2.5 and 6mm down well graded crushed stone chips broken from boulders (preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30), including breaking stone boulders into chips, screening through proper sieves, casting, finishing complete to camber and grade, compacting, curing at least for 28 days, etc. including cost and carriage of all materials, labour, water, electricity, other incidental cost etc. all complete as per design, drawing, specification & directionn of E-I-C. | cum | 0.798 | 12618.720 | |
3.06.4.2.01 | 25mmDC: Providing 25mm thick (minimum) compacted pre-mixed bituminous surfacing - wearing course with 16mm downgraded crushed stone chips complying with the specified grading requirement of the relevant item of Road Design standards, of LAA value <=30%, water absorption not >2%, flakiness index not >35% mixed with 60/70 penetration grade straight run bitumen satisfying the requirements of ASTM/AASHTO. The bitumen and stone-chips shall be separately heated to a temperature 140°C ? 155°C and 150°C ? 170°C respectively before mixing. The mixing shall be done at temperature between 140°C ? 160°C at a separate place away from the fire. The bitumen and stone-chips mixture shall be laid uniformly on the road surface in single appropriate layer to give specified compacted thickness maintaining specified camber, grade and super-elevation. The mixture should be rolled at a temperature not below 90°C with Steel Drum Roller (3-5 tons) & pneumatic multiple tire roller (8-10 tons) to full compaction, including supplying of all materials, their carriage, labourers tools and equipment etc. all complete as per the direction of the E-I-C. The bitumen in the mix shall be between 5.0% to 5.5% by weight of total mix or as determined by job mix design. (In order to achieve the specified grading a blending of nominal maximum size of 16mm, 12mm, 6mm crushed stone chips and stone dust is suggested and proportion will have to determine by the laboratory analysis). [Bitumen Grade 60/70] | sqm | 1255.165 | 543.470 | |
4.06.05.01 | Brick work with 1st class brick in specified cement mortar in foundation with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, curing at least for 7 days etc. all complete as per design, specification & direction of the E-I-C. Cement mortar (1:3) | cum | 3.000 | 8445.040 | |
4.05.01.01.01 | Earth work in excavation of foundation of structures by mechanical (Hydraulic excavator - Long Boom)/ manual means in all sorts of soil up to specified depth in accordance with requirements of lines, grades, cross sections and elevation as shown in the drawing including setting out, removal of stumps, logs, boulders and other deleterious materials, providing necessary tools and plants, construction of shoring and bracing, cleaning the excavated materials to a safe distance out of the site premises, cut to a firm surface including pumping/ bailing out water, removal of spoils to a safe distance, dressing of sides and bottom and backfilling of trenches up to original level with approved material etc. all complete as per approval of E-I-C. Contractor shall get acquainted with site conditions, nature of soil and adopt suitable adequate dewatering system as deemed fit for the nature of soil and prevailing water table to get the surface reasonably dry for laying PCC at the time of execution so that execution will not be hampered or delayed. Back-filled materials shall be compacted to a density comparable with the adjacent undisturbed material. For depth up to 3m | cum | 13.330 | 204.620 | |
4.09.03.05.01 | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For top slab including curb and wheel guard of box culvert Height up to 5 m | cum | 1.800 | 18567.630 | |
4.06.06.01 | Minimum 6mm thick cement plaster including neat cement finishing over concrete faces with sand of minimum FM 1.20 and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N including washing of sand, cleaning junctiongs of concrete, grouting, dabbing, doing independent double-legged scaffolding, finishing the edges and corners, cleaning of surfaces and curing for requisite period etc. all complete at all leads & lifts as per drawings, specification & direction of the E-I-C. Cement mortar (1:3) | sqm | 19.148 | 271.170 | |
3.04.2.1 | ReEE(75mm): Labour charge for Resetting the brick on end edging (75mm across) with 1st class/picked bricks, including cutting trenches true to level & maintaining grade, removing earth, re-filling & ramming the sides properly, including supplying and filling the gaps with local sand, etc. all complete as per direction of the E-I-C. | m | 1846.000 | 16.040 | |
3.01.4.2.01 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at specified degree of compaction etc. all complete as per direction of the E-I-C. Degree of Compaction: Minimum 98% of MDD (Standard Proctor) | sqm | 1919.991 | 97.740 | |
3.01.4.2 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at minimum compaction 98% of MDD (Standard) etc. all complete as per direction of the E-I-C. | sqm | 3108.950 | 91.600 | |
3.05.6 | CWBM(iSSM): Labour charge for compacted WBM base course with crusher run aggregate made of well burnt picked and 1st class bricks or stone having compacted thickness as per specifications including local handling, hand packing, watering, dry rolling followed by wet rolling in layers of specified loose thickness with 8~10 tonne road roller to attain minimum soaked CBR 80% or Design CBR at minimum degree of compaction 98% of MDD (Modified Proctor) including supplying choking/screening material as filler material @0.012cum/sqm or as required etc. all complete as per direction of the Engineering-in-charge. After adequate dry rolling, spreading of choking/screening material on the surface, sprinkling of water and rolling is to be continued until all the voids are filled, wave of grout/slurry flushes ahead of the roller. Thickness of each layer should not be more than 100mm loose and Payment will be made on compacted thickness. The rate excludes the cost of brick aggregates. | cum | 456.554 | 345.990 | |
3.11.14 | RCC(P+BW)-PW: Construction and Installing in position palisading work as per standard drawing enumerated in Appendix-6 (type designs for protective works) with 250mm thick Brick Masonry work & pre cast RCC Post of 03 (three) meter long (size 150mmX150mm) pre-cast RCC (1:1.5:3) post made by 20mm down graded brick chips to be driven by suitable monkey/drop hammer in 2/3rd of its total length @ 1 meter c/c into the ground laying on proper alignment, constructing of 250mm thick and 1 meter high vertical wall along the protective work using Brick Masonry work in cement mortar (1:3), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, including flush pointing at front face of the brick wall with cement mortar (1:2), curing for requisite period, including excavating minimum 300mm depth foundation trenches for brick wall and laying one layer polythene sheet, constructing 50mm thick cement concrete (1:3:6) on it & below the brick work by means approved designed including form work, etc. all complete in all respect as per approved drawing, specification and direction of the Engineer-in-charge. (Unit cost including reinforcement, its fabrication, shuttering, casting, curing for 28 days, driving of the post and all other incidental charges, etc.) | m | 84.000 | 5205.930 | |
2.05.1 | Leveling and dressing the embankment crown, road flanks, etc. in maintenance work by earth cutting and filling as necessary with maintaining proper slope and camber including compaction etc. all complete as per direction of the E-I-C. | sqm | 900.000 | 13.590 | |
7.08.01.05 | Supplying 25mm to 200mm dia (inside) best quality uPVC pipes having specific gravity 1.35-1.45, and other physical, chemical, thermal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets head and shoes, bends, clamps and nails etc. all complete in all floors as per direction of the E-I-C. Minimum inner dia 150mm and minimum wall thickness 4.5mm | m | 5.000 | 916.830 | |
2.02.3.01 | EFW(CE): Earth filling work with specified soil in any type of embankment, Earth shall be carried by truck/boat or any other means, supplied at contractor's own cost including royalty, cutting, carrying, filling and compacting to 85%/95%/98% maximum dry density at optimum moisture content, with reference to laboratory density test AAHSTO standard hammer by throwing earth in layers not more than150mm in proper alignment, grade, camber and side slope in all types of soil except rocky, gravelly and slushy including benching not more than 300mm in vertical and 600mm in horizontal steps along the sides while widening any embankment, with clod breaking to maximum size of 100mm, benching the side slopes, removing roots and stumps of trees of girth upto 200mm, stripping/ ploughing the base of embankment and borrow pit area, dug bailing, clearing jungles, bail out of water, rough dressing including 150mm cambering at the centre of crest with all leads and lifts complete (compaction will be done by the contractor with approved equipment including all ancillary charges for compaction and testing) as per direction of Engineer in charge. Payment will be made on compacted volume. The item is applicable when earth is supplied and arranged by the contractor from a distance beyond 200m from the end of right of way. Outside municipal area, 85% Compaction | cum | 177.030 | 314.800 | |
4.09.02.01 | RCC-20SCCM: Reinforced cement concrete work with minimum cement content relates to nominal mix ratio 1:2:4 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 28.5 MPa and satisfying a compressive strength f'c = 20 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.2 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 35) conforming to ASTM C33 including screening chips through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, fed by standard measuring boxes, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For pile caps, abutment base of bridges and bottom slab of Box Culvert | cum | 1.376 | 14076.570 | |
4.09.02.04.01 | RCC-20SCCM: Reinforced cement concrete work with minimum cement content relates to nominal mix ratio 1:2:4 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 28.5 MPa and satisfying a compressive strength f'c = 20 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.2 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 35) conforming to ASTM C33 including screening chips through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, fed by standard measuring boxes, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For T-girder & slab type super-structure including cross girders, side walk, curb, wheel guard of bridges For height up to 5 m | cum | 1.350 | 18787.630 | |
4.11.01.01 | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/ splice unless otherwise shown in the drawing, wastages, binding wire, concrete cover blocks etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET. Grade 300 (RB 300): Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2006 with minimum yield strength, fy (ReH) = 300 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 16% and 2.5% respectively. | kg | 358.457 | 87.930 | |
5.03.05.01 | Mass concrete work in foundation or floor with Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded 1st class/picked brick chips (LAA value not exceeding 38), including shuttering, mixing by concrete mixer machine, casting, laying compacting with mechanical vibrator machine and curing for the requisite period breaking bricks into chips etc. all complete as per direction of the E-I-C. Cylinder crushing strength of concrete should not be less than 17Mpa at 28 days of curing (suggested mix proportion 1:2:4). Additional quantity of cement to be added if required to attain the strength at the contractors own cost. Mass concrete in foundation (1:2:4) with Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded 1st class/picked brick chips. | cum | 2.700 | 9469.060 | |
5.04.02 | Brick work with 1st class bricks in cement mortar (1:4) in foundation and plinth with Portland Composite cement (CEM II/AM, 42.5N) and best quality sand (minimum FM1.2), filling the interstices tightly with mortar, raking out joints, cleaning and soaking bricks at least for 24 hours before use, washing of sand, curing for requisite period, etc. all complete as per direction of the E-I-C. | cum | 12.000 | 8043.780 | |
3.07.1 | PS: Supplying and laying of single layer polythene sheet weighing one kilogram per 6.5 square meter in floor or any where below cement concrete complete in all respect and accepted by Engineer-in-charge. [PWD 03.7] | sqm | 38.280 | 46.000 | |
4.09.03.01.A | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For pile caps, abutment base, facing elements of Reinforced/ Mechanically Stabilized Earth Structure, bottom slab of Box Culvert etc. | cum | 10.352 | 15568.240 | |
4.09.03.02.01.A | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practice of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For diaphragm walls, wing walls, piers, columns, projected pile cap above water level, pier caps, abutments of bridges and vertical members of box culverts For height up to 5m | cum | 13.024 | 16282.380 | |
4.09.03.05.01.A | RCC-25SCCM: Reinforced cement concrete work with minimum cement content relates to mix ratio 1:1.5:3 and maximum water cement ratio 0.4 having minimum required average strength, f'cr = 33.5 MPa and satisfying a compressive strength f'c = 25 MPa at 28 days on standard cylinders as per standard practic4.09e of Code AASHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II/A-L/M/V/W 42.5N, high range water reducing admixture of complying type A or F under ASTM C 494 (Doses of admixture to be fixed by the mix design), sand of minimum FM 2.5 and 20mm down well graded crushed stone chips broken from boulders (Preferably stone chips from Madhyapara, Dinajpur, LAA value not exceeding 30) conforming to ASTM C33 including breaking chips, screening through proper sieves, cleaning, placing shutter in position, making shutter water-tight properly, placing reinforcement in position, mixing in standard mixture machine with hoper, maintaining allowable slump of 75mm to 100mm, casting in forms, compacting by mechanical vibrator machine, curing for 28 days, removing centering-shuttering after approved specified time period, other incidental charges, etc. all complete as per drawing, specification & direction of the E-I-C. The cost of reinforcement and it's fabrication, welding, coupling, placing, binding etc. is not included but the cost of admixture is included in this unit rate. Additional quantity of cement to be added if required to attain the strength at the contractor's own cost. Note: Using Concrete Mixer For top slab including curb and wheel guard of box culvert Height up to 5 m | cum | 9.560 | 18567.631 | |
4.11.01.02.A | Supplying and fabrication of Ribbed or deformed bar reinforcement for all types of RCC work including straightening, removing ruts, cleaning, cutting, hooking, bending, lapping and/or welding wherever required as directed, placing in position, tieing with 22 BWG black annealed binding wire (PVC coated in case of FBEC rebar) double fold, cost of binding wire and anchoring to the adjoining members wherever necessary, supplying and placing with proper cover blocks (1:1), supports, chairs, spacers, splices or laps etc. including cost of all materials, cost of labour, cost of equipment & machinery, loading and unloading, transportation, all other incidental charges and work at all leads and lifts etc. to complete the work as per design, drawing, specifications and direction of the E-I-C. Measurement relating to nominal mass, dimensions and tolerances of various types of steel shall conform to relevant BDS/ ASTM codes. Reinforcement shall be measured only in lengths of bar as actually placed in position on standard weight i.e. 7850 kg/m3 (BNBC Table 6.2.1) basis. No separate payment shall be allowed for chairs of any shape & profile, spacer bar of any shape & profile, lap/splice & welding unless otherwise shown in the drawing, wastages, binding wire etc. as the cost of these is included in the unit rate. Note: Tests for reinforcing bars shall be conducted at LGED/ BUET/ CUET/ KUET/ RUET. Grade B400C-R/ B400CWR/B400DWR: Ribbed or Deformed bar produced and marked as per BDS ISO 6935-2:2016 with minimum yield strength, fy (ReH) = 400 MPa, but the tested yield strength shall not exceed fy by more than the 125 MPa and the ratio of tested ultimate strength, fu (Re) to tested yield strength (fy) shall be at least 1.25 and minimum elongation after fracture (A5.65) & minimum total elongation at maximum force (Agt) is 17% and 8% respectively. | kg | 3097.000 | 104.340 | |
4.13.03 | BF: Back filling behind abutments, wing walls and retaining walls with selected granular material (50:50 best quality picked brick chips & sand of min. FM 1.00) of minimum 450 mm width, in layers of 150 mm thickness free from dust, impurities etc. including compaction using plate compactor, watering & dressing, supply & cost of all materials, carrying and labour, hire charge of plate compactor and other tools etc. all complete as per direction of the Engineer-In-Charge. Payment to be made for the compacted volume only for a compaction of 90% of the maximum dry density. | cum | 15.120 | 3129.600 | |
2.02.1.2.A | EFW: Earth work in road embankment up to a lift of 1.5 m in all kinds of soil including cutting and throwing earth in layers not exceeding 150 mm in thickness, breaking clods up to 40 mm size in each layer, ramming, leveling and dressing as per required side slope and alignment with earth borrowed from the road side govt. acquired land for any leads and maintaining the embankment true to level and side slopes as per profiles for one year from the date of completion including making dug, bailing, profiling etc. complete and accepted by the Engineer-in-charge. [PWD 24.1] For additional lift of 1 m beyond 1.5 m up to 2.5 m | cum | 96.000 | 209.000 | |
3.01.4.2.01 | BC&SGC(450mm): Earth work in box cutting on road crest up to 450mm depth, maintaining proper grade, camber and alignment, super elevation on curves, removing soils to a safe distance or if necessary, spreading the excavated earth on road flanks and slopes uniformly including leveling, dressing, watering to bring moisture content ± 2% of OMC & compacting the sub-grade by appropriate mechanical means to attain design CBR at specified degree of compaction etc. all complete as per direction of the E-I-C. Degree of Compaction: Minimum 98% of MDD (Standard Proctor) | sqm | 4680.544 | 97.740 | |
4.13.02.07 | Supplying, fitting and fixing of G.I. pipe with all special fittings, such as bends, elbows, sockets, reducing sockets, Tee, unions, jam-nuts etc. including cutting trenches where necessary and fitting the same with earth duly rammed and fixing in walls with holder bats and making hole in floors, walls and consequent mending good the damages etc. all complete in all respects approved and accepted by the Engineer- in- charge.[PWD 26.42] RWDP50PVC: 50mm uPVC Pipe of 2.5mm to 3mm wall thickness conforming to BS 3505 | m | 1.600 | 180.930 | |
4.03.05.03 | Construction of temporary dirvertion road of minimum with 4.80m on detour wirh arranged earth etc. all complete as per direction of the EIC. | cum | 144.000 | 314.000 | |
5.03.04.02 | Mass concrete work in foundation or floor with Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded 1st class/picked brick chips (LAA value not exceeding 38), including shuttering, mixing by concrete mixer machine, casting, laying compacting with mechanical vibrator machine and curing for the requisite period breaking bricks into chips etc. all complete as per direction of the E-I-C. Cylinder crushing strength of concrete should not be less than 10.5Mpa at 28 days of curing (suggested mix proportion 1:3:6). Additional quantity of cement to be added if required to attain the strength at the contractors own cost. Mass concrete in floor (1:3:6) with Portland Composite Cement (CEM II/AM, 42.5N), sand (minimum FM 1.20) and 20mm down well graded 1st class/picked brick chips.. | cum | 2.100 | 8806.100 | |
3.01.3.1 | BC(300mm): Earthwork in box cutting on road crest up to 300mm depth in all types of soil. Removing soil to a safe distance, maintaining proper alignment, camber and grade including leveling, dressing and compacting the sub grade as per drawing and accepted by the Engineer-in-charge. [PWD 24.2.1] | sqm | 16.973 | 60.001 | |
3.11.01 | PCCBC-10: Plain cement concrete work in foundation with minimum compressive strength of 10 Mpa at 28 days (sugessted mix proportion 1:3:6) on standard cylinder as per standard practice of Code AASTHTO/ ASTM and cement conforming to BDS EN 197-1 : 2003 CEM-II /A-M, 42.5 N, best quality sand (FM. 1.2) and 20mm down well graded picked brick chips (LAA value and maximum water absorption not exceeding 38 & 15% respectively) conforming ASTM C-33, including breaking chips and screening, placing shutter in position and maintaining true to the alignment, making shutter water-tight properly, mixing in standard mixture machine, casting in forms, compacting by vibrator machine and curing for 28 days, removing shuttering after specified time approved, etc. all complete approved and accepted by the E-I-C. (Additional quantity of cement to be added if required to attain the strength at the contractors own cost). | cum | 1.273 | 7858.551 | |
5.04.15 | 125 mm brick work with first class bricks with cement sand (F.M. 1.2) mortar (1:6) and making bond with connected walls including necessary scaffolding, raking out joints, cleaning and soaking the bricks for at least 24 hours before use and washing of sand, curing at least for 7 days in all floors including cost of water, electricity and other charges etc. all complete and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M) In ground floor (PWD BW 04.15) | sqm | 9.303 | 1103.001 | |
10.03.6 | Installation of tube-well fixture for observation well: Supplying and lowering of 40/38 mm inside dia best quality uPVC pressure tube well pipe (specific gravity 1.35 - 1.45, wall thickness 2.5 mm - 3.0 mm capable to withstand a minimum hydrostatic pressure of 170 psi for 1 hr). Fitting and fixing in position with all accessories, uPVC sand trap of length 3.00m with uPVC strainer of desired slot installing in or at mid depth of the most suitable water bearing strata, 38 mm dia, best quality G.I. pipe of length 1.52 m with M.S. welded flat bar welded on each side to prevent from rotation up to desired depth, fitting, fixing the best quality no. 6 C.I. head hand-pump etc including the cost of solvent cement, socket adapter, filling medium sand up to 18.00 m above strainer and the remaining portion with available soil from boring etc. complete as per standard specification and accepted by the Engineer-in-charge. Best quality 38 mm dia uPVC cap (PWD BW 27.3.6) | each | 1.000 | 104.001 | |
5.15.06.2 | Supplying, fitting and fixing country made glazed wall tiles complying BDS ISO 13006: 2015, irrespective of color &/or design, with 20 mm thick cement sand (F.M. 1.2) mortar (1:3) base and raking out the joints with white cement including cutting, laying and hire charge of machine and finishing with care etc. including cost of water, electricity and other charges complete in all respect and accepted by the Engineer-in-charge. (Cement: CEM-II/B-M). In ground floor (PWD BW 06.6) Wall tiles more than 250 mm x 330 mm & less than or equal to 250 mm x 400 mm in sizes | sqm | 9.541 | 1523.001 | |
7.29.3 | Supplying, fitting and fixing of best quality country made 12 mm bib cock made from copper or copper alloy, chromium plated. The faucet conforms BDS EN 200:2009. The faucet tap shall be free from any leakage, permeation and other abnormalities. The water hammer value shall be 1.47 Mpa or under. The faucet after it has been operated 100000 times it shall be free from a seat- leakage and shall satisfy the reverse flow preventing performance. The inside and outside surfaces of the faucet shall be smooth and be free from blowholes, fissures, remarkable flows or injurious defects. The chromium plating on the faucet shall be of class 2 grade 1. The final coating should be done with chromium of minimum 0.1 micron. The faucet shall be made leak proof and fixing in position with selected tape etc. , all complete approved and accepted by the Engineer- in- charge. 12 mm CP open Bib Cock (PWD BW 26.29.3) | each | 18.000 | 971.001 | |
7.30.4 | Supplying, fitting and fixing of best quality surface mounted or conceal stop cock/angle stop cock (lever or round headed) with wall flange chromium plated. The faucet conforms BDS EN 200:2009. The faucet tap shall be free from any leakage, permeation and other abnormalities. The water hammer value shall be 1.47 Mpa or under. The faucet after it has been operated 100000 times it shall be free from a seat- leakage and shall satisfy the reverse flow preventing performance. The inside and outside surfaces of the faucet shall be smooth and be free from blowholes, fissures, remarkable flows or injurious defects. The chromium plating on the faucet shall be of class 2 grade 1. The final coating should be done with chromium of minimum 0.1 micron. The faucet shall be made leak proof and fixing in position with selected tape etc. , all complete approved and accepted by the Engineer- in- charge. CP angle stop cock (PWD BW 26.30.4) | each | 1.001 | 977.001 | |
7.45.3 | Supplying different inside dia best quality uPVC pressure pipe for water supply having specific gravity 1.35 - 1.45, and other physical, chemical, themal, fire resistivity properties etc. as per BSTI approved manufacturer standards or ASTM, BS/ISO/IS standards fitted and fixed in position with sockets, bends, with all accessories such as Round grating/domed roof grating, bends, sockets etc. approved and accepted by the Engineer-in-charge. 25 mm dia wall thickness 2.2 mm - 3.4 mm (PWD BW 26.45.3) | m | 0.450 | 266.001 | |
Post Views: 277